Land North Of Orchard House The Avenue Medburn Northumberland
Discharge of conditions : 4 (surface water), 8 (floor levels, 10 (ecology), 12 (tree/hedges), 13 (landscape), 14 (boundary treatment), 16 (car/cycle parking), 18 (construction method statement) and 21 (levels) pursuant to planning approval 18/02939/OUT
Holiday Inn Fisher Lane Seaton Burn Northumberland NE13 6BP
Discharge of conditions 3 (Geo-Environmental Desk Study & Coal Mining Risk Assessment), 4 (ground gases), 7a(noise emissions) 11 (landscape planting), 12 (integrated bird boxes and/or bat boxes), 15 (tree felling or vegetation clearance), 18 (highway works), 21 (Construction Method Statement) and 22 (surface water) on approved application 19/00971/FUL.
Land West Of Lancaster Park Pinewood Drive Lancaster Park Morpeth Northumberland
Discharge of Conditions 4 (boundary treatment), 6 (car parking area), 12 (street maintenance), 14 (cycle parking),15 (surface water drainage), 18 (construction method statement), 19 (refuse storage), 23 (mitigation measures), 25 (tree protection), 27 (landscaping), 31 (flood risk assessment) and 37 (acoustic design scheme) in relation to 16/00078/OUT
Burnside Lodge Eastgate Bank Mickley Stocksfield Northumberland NE43 7LY
Discharge of conditions 3 (external materials and boundary treatments), 4 (energy efficiency), 5 (tree protection plan), 6 (hard and soft landscaping), 7 (construction method statement), 8 (vehicular access), 11 (ecological report), 13 (land contamination) , 14 (contamination verification), 16 (ground gas protective measures) in relation to approved application 20/04441/FUL (Amended Description 06/05/2022).
Land At Burnside Hepscott Morpeth Northumberland NE61 6NB
Discharge of conditions 5(facing materials and finishes), 6(proposed means of enclosure), 7(hard and soft landscaping), 10(Construction Environmental Management Plan), 12(car parking), 13(cycle parking), 14(service vehicle manoeuvring space), 15(Construction Method Statement), 18(surface water),19(coal mining assessment), 20(foul sewerage), 22(full tree and hedge survey), 25(Tree Protection Plan), 27(protective measures), and 29(contamination report) on approved planning application 16/01944/OUT.
Land North East Of Close Cottage Rugley Road Alnwick NE66 2AG
Discharge of conditions 5 (cycle parking), 7 (proposed highway works), 8 (Means of Access), 10 (Construction Method Statement), 11 (Ecology Mitigation Enhancement), 13 (Tree Works), 14 (landscape planting plan), 15 (Surface Water Disposal), 16 (disposal of surface water from the development through the construction phase) and 18 (external lighting) on approved application 20/03815/VARYCO.
Land At Tranwell Airfield C153 At Gubeon Plantations Tranwell Woods NE61 3FR
Discharge of conditions 2(construction materials), 3(ecological risk assessment), 4(landscaping scheme), 5(tree protection), 14(protective measures), 15(cleaning facility) and 16(storage of materials and the parking) on approved application CM/20100582.
Land South East Of The Quarry Batt House Road Stocksfield Northumberland
Variation of condition 2 (approved plans) to reposition dwelling by 1.0m toward North West, and discharge conditions 5 (Landscaping), 6 (Surface Water Drainage), 7 (Construction Method Statement), 12 (Amphibian Method Statement) and 13 (Tree and Hedge Protection) in relation to approved application 20/02208/FUL (Amended description 03/12/2021).
Land South Of 101 Eastern Way Darras Hall Ponteland Northumberland
Variation of condition 2 (Approved Plans) for the retention of sycamore tree and Discharge of conditions 3 (Materials), 5 (Vehicular Access), 6 (Surface Water Drainage), 7 (Construction Method Statement), 8 (Refuse Storage) and 12 (Landscape) pursuant to planning permission 18/03751/FUL
Land South East Of New Hall Farm Amble Northumberland
Discharge of conditions 5(Construction Environmental Management Plan), 6(Landscape and Biodiversity Management Plan), 7(Species Mitigation), 9(Tree Protection Plan), 10(Badger Mitigation), 13(Intrusive Site Investigations), 14(Site Investigation and/or Remedial Works), 15(Ground Gas), 16(Contaminated Land), 20(Construction Method Statement), 21(off-site Highway Works), 23(Refuse Storage & Strategy), 24(Car Parking), 26(Surface Water Drainage from Private), 28(External Surface Materials), 29(Highway Site Levels), 30(Affordable Housing Provision), 31(Foul & Surface Water Drainage), 32(Surface Water Drainage), 33(Drainage Design), 34(Adoption & Maintenance of SuDs) and 35(Water Drainage (Construction Period)) on approved application 18/01529/OUT.