46 Oaky Balks Alnwick Northumberland NE66 2QE
Certificate of Lawful Development - Proposed Use for Demolition of existing garage and construction of single storey side extension with decking to the rear. Installation of dropped kerb and creation of wider driveway to front of property.
Loughrigg 9 Windmill Hill Hexham Northumberland NE46 3EE
Certificate of Lawful Development for proposed demolition of existing stone outhouse and store and construction new utility space with outside access. Also to adjust the rear elevation to the existing kitchen to install new French doors.
Thomas Sherriff And Co Ltd Tweedside Trading Estate Tweedmouth Berwick-Upon-Tweed Northumberland TD15 2XD
Non Material Amendment to allow the revised proposal for two structures with ancilliary plant and machinery measuring 1550m2 in total, the amended floor areafloorplan area is therefore 14% less (250m2) with a building massing reduced by 48%. These reductions constitute a minor amendment that reduces overall development impact in every dimension. 4 x 4MW boilers housed in a low rise block of 8.9m in height with the highest structures being the external filters at 11.1m. These replace the single larger boiler. The fuel store is no longer required but that footprint will now be required to house a 12MW electrical boiler, the dimensions of this second building remain similar at 12m to the ridge and a footprint of 448m2 (included in the 1550m2 total) Existing 4-core stack of 26m height becomes 4 x single core stacks of the same height offering better stack dispersion. Emissions to air from 16MW biomass are nominally 20% less by volume than from 20MW biomass. Although the biomass is designed to run year round, in practicethe electric boiler will run in its stead (with the biomass dormant) for approximately 35% of the year. This also reduces HGV fuel transport movements by around 45% overall. There is no emission from the 12MW electric boiler. The AQA shows that any impact on the nearest receptor to be inconsequential. Retention of the Sherriff building creates a significant carbon footprint reduction from the reduction in construction materials etc required as well as the energy required for demolition and the transport and disposal of demolition waste. The existing building will now be preserved and re-purposed to serve as a fuel store. This means that much of the consented roadway is no longer required and the existing road way will be re-purposed and improved. Reduce the overall yardage within the red line. The combined 16MV biomass plus 12MW electric potential displaces more fossil fuel use than the consented proposal on approved application 20/03811/FUL
Former St Aidans Rc First School Norham Road Ashington NE63 0LF
Discharge of conditions 12(dust management plan), 14(disposal of surface water), 24(Demolition and Construction Method Statement), 26(refuse storage), 27(ecological reports), 28(trees), 30(Trees in Relation to Design, Demolition and Development), 32(intrusive site investigations) and 33(details of all screening) on approved application 20/02894/FUL.
Kielder Community First School U5085 Kielder Library Access Road Kielder NE48 1HQ
Removal of Condition 7 (Demolition/Construction Method Statement) on approved application 18/00794/VARYCO - Superfluous to requirement now that the development has finished (amended 20.09.2021)
Former Morpeth Police Station Castle Square Morpeth Northumberland NE61 1YH
Proposed development of a total of 32 residential units and associated access and external works. Development consists of the refurbishment and change of use of the former police building, garages and stables into 6 apartments and 1 house, and the demolition of workshops, rear police building and former police houses for the new build construction of 18 apartments and 7 houses..