Land To West Of Park Road Park Road Haltwhistle Northumberland
Discharge of conditions : 4 (materials), 5 (landscaping), 6 (landscape management), 9 (lighting), 17 (highway), 21 (construction method), 23 (rail infrastructure), 52 (surface water), 55 (SUDs/Water Voles) , 57 (water voles), 59 (lighting), 60 (landscape/ecology management), 62 (bird/bat boxes) and 64 (ground gasses) pursuant to planning approval 19/01489/FUL
Thomas Sherriff And Co Ltd Tweedside Trading Estate Tweedmouth Northumberland TD15 2XD
Discharge of conditions 4(crossing method of footpath no.7), 5(detailed landscaping scheme), 6(scheme to dispose of surface water), 7(scheme which mitigates overland surface water flows), 8(disposal of surface water), 10(contamination of land or pollution of controlled waters), 11(remediation strategy), 12(demolition and construction method statement), 13(monitoring and maintenance plan) and 14(protective measures) on approved application 23/01642/FUL (amended description 7th December 2023)
Land South East Of Bastle House Tow House Northumberland
Discharge of conditions : 6 (materials), 7 (stonework and mortar sample specification), 9 (landscape), 10 (boundary treatment), 11 (materials - external/access), 12 (car parking), 13 (cycle parking), 14 (surface water), 15 (construction method statement), 16 (refuse storage/strategy), 17 (ground gas), 19 (land contamination) and 20 (Verification of Soil Remediation) pursuant to approved application 20/04380/OUT (As amended- 25/08/2023, 15/09/2023 and 10/11/2023).
Phase B Land East Of Wansbeck General Hospital Northern Relief Road Ashington Northumberland
Discharge of conditions 2 (phasing programme), 12 (acoustic design), 15 (landscape and biodiversity), 20 (open space management), 23 (foul sewerage), 24 (surface water), 26 (SuDS), 27 (surface water), 29 (health and safety assessment), 32 (verification report), 35 (lighting), 36 (materials), 37 (car parking), 38 (highway works), 40 (phasing/completion plan), 41 (street management/maintenance), 42 (engineering works), 43 (cycle parking), 46 (construction method statement) and 47 (refuse storage) on approved application 16/02432/OUT
Harbour Offices South Harbour Blyth Northumberland NE24 3PA
Discharge of conditions 3 (Construction Method Statement), 10 (Landscape and Ecology Management Plan) and 11 (Construction Environment Management Plan) on approved application 22/01061/CCD
Land South West Of Mill Covert The Lane Whittingham Northumberland
Discharge of Conditions 4 (Cycle Parking), 5 (Refuse Storage), 7 (Landscaping), 8 (Foul Drainage) and 9 (Sustainable Construction) pursuant to planning permission 22/02059/FUL
Land North Of Grange Park B1340 Rennington To Christon Banks Rennington Northumberland
Discharge of Conditions 6 (Boundary Treatment), 9 (Car Parking), 12 (Management & Maintenance of Streets), 14 (Cycle Parking), 15 (Surface Water Drainage), 16 (Refuse Storage), 17 (Construction Method Statement), 19 (Surface Water), 23 (Emergency Contact Details), 28 (Landscaping) and 29 (Bat and Bird Boxes) on approved application 18/04410/OUT
Land North Of Unit 28 Spencer Road Riverside Business Park Blyth Northumberland
Discharge of Conditions 3 (Drainage), 5 (Landscaping), 7 (Surface Water), 8 (Surface Water), 10 (Surface Water), 14 (Boundary Treatment), 16 (Access), 18 (Surface Water), 21 (Construction Plan) and 23 (Service Delivery) relating to planning permission 19/03493/OUT
Land South And West Of White Hall Farm Beacon Lane Cramlington Northumberland
Discharge of conditions : 2 (external lighting) 5 (street management/maintenance), 6 (street adoption details), 10 (Management and Maintenance Plan) 11 (bird/bat boxes), 12 (construction/environment management plan), 13 (open space/SUDS), 14 (external materials) and 15 (landscape) pursuant to planning approval 21/04568/REM. (Amended)
Storage Rear Of 13 Cattle Market Hexham Northumberland NE46 1NJ
Discharge of conditions 4 (contamination), 8 (archaeology), 13 (highway works), 14 (cycle parking), 15 (surface water drainage), 16 (electric vehicle charging), 18 (demolition and construction method statement), 19 (external materials), 20 (windows/doors), 24 (hard/soft landscaping materials), 25 (boundary treatments), 26 (existingproposed levels) and 29 (climate change) on approved application 22/03694/FUL