Burgham Park Golf Club Burgham Park Felton Morpeth Northumberland NE65 9QP
Non-material amendment pursuant to planning permission 11/00938/VARYCO to revise development description to Expansion of existing facilities to provide new club house, hotel, conference facilities, leisure club, driving range and residential properties (Use Class C3)
North End Farm Longframlington Northumberland
Non-material amendment (conversion of the existing loft space within Plots 2 and 3 of the original development and installation of openable rooflights. Additional window to bed 1 ensuite and omission of window to adjoining garage on Plot 2. Enlargement of detached garage by 600mm in depth and omission of window to detached garage on Plot 3) on approved planning application 21/01086/VARYCO
Land South Of Aiden Grove And Lynemouth Road Lynemouth Road Ellington Northumberland
Non-material amendment - Rewording of Condition 12 (Remedial Strategy) on approved application 14/03016/FUL in order to vary the current planning condition is incorrectly worded, does not work in terms of timings and cannot be satisfactorily addressed pre-commencement. The development hereby approved shall be carried out in accordance with the Remedial Strategy for land at Ellington Colliery - Sirius Geotechnical and Environmental Ltd, (March 2015). Two copies of a full closure report (validation report) shall be submitted to, and approved in writing by, the Local Planning Authority. The report shall provide verification that the required works regarding contamination have been carried out in accordance with the approved Remediation Statement. Post remediation sampling and monitoring results shall be included in the closure report to demonstrate that the required remediation has been fully completed.
Land North And West Of Hillcrest East Ord Northumberland
Non Material Amendment (vary wording to condition 18 to allow development to commence on-site) on approved application 18/00828/OUT
Land West Of North End Farm Longframlington Northumberland NE65 8DZ
Non Material Amendment (provide clarification on the boundary treatments proposed as part of the development) on approved application 21/02463/VARYCO.
1-4 The Square Guide Post Choppington Northumberland NE62 5BZ
Non - material amendment (Vary the wording of condition 3 to add "other than demolition". i.e "The development hereby permitted shall not be commenced, other than demolition, until a scheme to deal with contamination of land or controlled waters has been submitted to and approved in writing by the Local Planning Authority) on approved application 21/03733/FUL. .
Land West Of North End Farm Longframlington Northumberland
Non-material amendment (conversion of the existing loft space within Plot 6 of the original development and installation of openable rooflights. No other external alterations) on approved application 21/01086/VARYCO.
Berwick Infirmary Well Close Square Berwick-Upon-Tweed Northumberland TD15 1LT
Non-material amendment relating to planning permission 20/01882/FULES to adopt a phased approach to the construction of the new community hospital development in order to mitigate the potential delays owing to the archaeological investigation and also assist with the contractor procurement process
Land West Of North End Farm Longframlington Northumberland
Non Material Amendment: (Conversion of the existing loft space within Plot 6 of the original development and installation of openable rooflights) on approved planning application 21/02463/VARYCO
Thomas Sherriff And Co Ltd Tweedside Trading Estate Tweedmouth Berwick-Upon-Tweed Northumberland TD15 2XD
Non Material Amendment to allow the revised proposal for two structures with ancilliary plant and machinery measuring 1550m2 in total, the amended floor areafloorplan area is therefore 14% less (250m2) with a building massing reduced by 48%. These reductions constitute a minor amendment that reduces overall development impact in every dimension. 4 x 4MW boilers housed in a low rise block of 8.9m in height with the highest structures being the external filters at 11.1m. These replace the single larger boiler. The fuel store is no longer required but that footprint will now be required to house a 12MW electrical boiler, the dimensions of this second building remain similar at 12m to the ridge and a footprint of 448m2 (included in the 1550m2 total) Existing 4-core stack of 26m height becomes 4 x single core stacks of the same height offering better stack dispersion. Emissions to air from 16MW biomass are nominally 20% less by volume than from 20MW biomass. Although the biomass is designed to run year round, in practicethe electric boiler will run in its stead (with the biomass dormant) for approximately 35% of the year. This also reduces HGV fuel transport movements by around 45% overall. There is no emission from the 12MW electric boiler. The AQA shows that any impact on the nearest receptor to be inconsequential. Retention of the Sherriff building creates a significant carbon footprint reduction from the reduction in construction materials etc required as well as the energy required for demolition and the transport and disposal of demolition waste. The existing building will now be preserved and re-purposed to serve as a fuel store. This means that much of the consented roadway is no longer required and the existing road way will be re-purposed and improved. Reduce the overall yardage within the red line. The combined 16MV biomass plus 12MW electric potential displaces more fossil fuel use than the consented proposal on approved application 20/03811/FUL