Ponteland Leisure Centre Callerton Lane Ponteland NE20 9EG
Discharge of conditions: 2 (Facing Brick and Roof Tiles Material Samples), 6 (Full School Travel Plan), 7 (Framework School Travel Plan), 8 (Electric Vehicle Charging Points), 9 (External Surfaces Material Samples), 10 (Highway Works), 11 (Details of Car Parking), 12 (Bus and Coach Parking), 13 (Cycle Parking), 14 (Bridge Over Bridleway 419/054 and Bridleway Works), 18 (Disposal of Surface Water During Construction), 19 (Boundary Treatment), 21 (External Lighting), 26 (MUGA Design and Operation Scheme), 27 (Gas Protection Measures and Validation Report), 29 (MUGA Floodlighting), 32 (Permanent and Temporary Lighting), 37 (Landscape and Ecological Management Plan), 40 (Transitional Pitch Arrangements), 41 (Replacement Playing Field Management and Maintenance), 42 (Ball Strike Risk Assessment), 43 (AGP and MUGA Construction, Surfacing, Fencing, Means of Enclosure, Floodlighting and Line Markings) and 44 (Community Use Agreement) relating to planning approval 17/03729/CCD (Further information submitted for Conditions 6, (22/09/2020), 7 (22/09/2020), 11 (16/06/2020), 12 (16/06/2020), 13 (16/06/2020), 14 (16/06/2020), 19 (21/09/2020), 21(14/07/2020), 26 (10/09/2020), 27 (10/09/2020), 32 (15/09/2020), 37 (18/06/2020 & 21/09/2020) & 42 (23/09/2020)
Harbour Cottage 5 Haven Hill Craster NE66 3TR
Certificate of Lawful Development - Proposed Use for new hard landscaping including alterations to change a timber deck to a slate patio and timber fence to be replaced with metal post and wire rail to match the neighbouring property. The levels of the upper and lower patio will be as per existing arrangement with the steps repositioned to maximize seating space on the upper patio.
Land South West Of The Old Tweed Mill Springwood Swarland Northumberland
Discharge of conditions 5(scheme to protect dwellings from golf balls), 7(dispose of surface water), 8(SuDS), 9(compensatory storage), 10(culverting / crate system), 11(Finished floor levels), 12(boundary walls and fences), 13(ecological report ), 16( landscape planting and management plan), 17( Phase 1 Desktop Study), 18(boundary treatment), 22(proposed arrangements) and 26(construction method statement) on approved application 17/00500/OUT.
Brada Quarry Park Bamburgh Northumberland NE69 7AD
Discharge of conditions 2 (materials), 3 (external lighting), 4 (landscaping), 5 (passing places), 6 (vehicular access), 7 (turning area), 8 (parking spaces), 9 (pedestraian links), 10 (entrance gates), 11 (existing vehicular access), 12 (surface water), 13 (surface water), 14 (botanical monitoring), 15 (elimination of pirri-pirri bur) and 16 (fence details) of application 17/00330/VARYCO