1 - 7 Priestpopple Hexham Northumberland
Non-material amendment (4no. opaque windows on west elevation replaced with painted brick panels. All brickwork to be now made good & painted cream. New curtain walling to west elevation stair to match existing. Additional OV added to west elevation. Cast iron SVPs & dry riser inlet cabinet added to side elevation. Existing fascia now painted RAL 7012. Proposed flat roof plant enclosure & other works replaced with new railing & gate. Proposed rear car park bollards updated, residential bin store enclosure added, car park column lights added. Landscaping by main entrance to be retained & made good) pursuant to planning permission 19/04545/FUL
Land South West Of Kennels Cottage Hope Lane Matfen Northumberland
Discharge of Conditions 4 (Windows/Doors), 5 (Masonry), 6 (Internal Openings), 7 (Roof/Floor/Walls), 8 (Structural Frame), 9 (Stove and Fireplace) and 10 (Landscaping) pursuant to listed building consent 22/00984/LBC
The Hott Thorngrafton Hexham Northumberland NE47 7AD
Proposed 1.5 storey extension to the rear will provide a new staircase; two extensions onto the west gable will provide two storeys of additional living accommodation, plus a single storey link to the updated outbuilding to be clad in timber; the two storey and 1.5 storey extensions to have roof pitches; double garage with timber clad; the landscape and ground levels will be updated to provide access to the garage and accommodate the extensions.
Ponteland Leisure Centre Callerton Lane Ponteland NE20 9EG
Discharge of conditions: 2 (Facing Brick and Roof Tiles Material Samples), 6 (Full School Travel Plan), 7 (Framework School Travel Plan), 8 (Electric Vehicle Charging Points), 9 (External Surfaces Material Samples), 10 (Highway Works), 11 (Details of Car Parking), 12 (Bus and Coach Parking), 13 (Cycle Parking), 14 (Bridge Over Bridleway 419/054 and Bridleway Works), 18 (Disposal of Surface Water During Construction), 19 (Boundary Treatment), 21 (External Lighting), 26 (MUGA Design and Operation Scheme), 27 (Gas Protection Measures and Validation Report), 29 (MUGA Floodlighting), 32 (Permanent and Temporary Lighting), 37 (Landscape and Ecological Management Plan), 40 (Transitional Pitch Arrangements), 41 (Replacement Playing Field Management and Maintenance), 42 (Ball Strike Risk Assessment), 43 (AGP and MUGA Construction, Surfacing, Fencing, Means of Enclosure, Floodlighting and Line Markings) and 44 (Community Use Agreement) relating to planning approval 17/03729/CCD (Further information submitted for Conditions 6, (22/09/2020), 7 (22/09/2020), 11 (16/06/2020), 12 (16/06/2020), 13 (16/06/2020), 14 (16/06/2020), 19 (21/09/2020), 21(14/07/2020), 26 (10/09/2020), 27 (10/09/2020), 32 (15/09/2020), 37 (18/06/2020 & 21/09/2020) & 42 (23/09/2020)