Land West Of Lea Hall Cottage Splitty Lane Catton Northumberland NE47 9QU
Discharge of conditions 5 (ecological report), 8 (landscaping), 9 (site levels), 10 (car parking), 11 (vehicular access and reinstatement of highway), 12 (proposed highway works), 13 (proposed arrangements), 14 (cycle parking), 15 (construction method statement), 16 (refuse storage), 18 (foul and surface water), 19 (materials) and 21 (boundary treatments) on approved application 19/03666/OUT.
Land East Of Allenheads/Former Whytrig Middle School The Avenue Seaton Delaval Northumberland
Construction of new school buildings, sports centre, external sports pitches, landscaping, parking and access at Land North of The Avenue, Seaton Delaval and parking and access at former Whytrig Middle School Site, Western Avenue, Seaton Delaval (amendment to red line boundary 27.20.2022)
Land North Of Orchard House The Avenue Medburn Northumberland
Discharge of conditions : 4 (surface water), 8 (floor levels, 10 (ecology), 12 (tree/hedges), 13 (landscape), 14 (boundary treatment), 16 (car/cycle parking), 18 (construction method statement) and 21 (levels) pursuant to planning approval 18/02939/OUT
58 Willow Way Darras Hall Ponteland Northumberland NE20 9RF
Discharge of Conditions 8 (Dust Management Plan), 13 (Ground Gas), 15 (Boundary Treatment) and 17 (Construction Method Statement) relating to planning permission 21/01474/FUL
Woodstock Mill Lane Haltwhistle Northumberland NE49 9LW
Retrospective application for works carried out to add pillars with metal railings between at front boundary wall; stone face side wall between front and rear garden and construction of raised timber deck.
Land West Of Lancaster Park Pinewood Drive Lancaster Park Morpeth Northumberland
Discharge of Conditions 4 (boundary treatment), 6 (car parking area), 12 (street maintenance), 14 (cycle parking),15 (surface water drainage), 18 (construction method statement), 19 (refuse storage), 23 (mitigation measures), 25 (tree protection), 27 (landscaping), 31 (flood risk assessment) and 37 (acoustic design scheme) in relation to 16/00078/OUT
Hexham Community Centre Gilesgate Hexham Northumberland NE46 3NP
Construction of new stone boundary wall alongside embankment 1.8m high, removal of embankment within confines of wall and creation of secure garden and play area, with separate enclosed bin store at rear (as amended)
Land At South West Of Townfoot Farm Shilbottle Northumberland
`Discharge of conditions 4 (boundary treatments), 5 (car parking), 6 (refuse storage), 8 (construction method statement) and 15 (surface water) on approved application 19/04548/FUL
Bedlington Station Primary School School Road Bedlington Northumberland NE22 7JQ
Construction of new single storey modular building to house reception and nursery provision including necessary improvements to boundary fencing for safeguarding and landscaping (soft and hard) to improve circulation and outdoor play space in line with DfE requirements
Land West Of 62 Station Road Station Road Stannington NE61 6NN
Discharge of conditions 1 (approval of details), 2 (reserved matters application), 3 (expiration of two years), 4 (approved plans), 5 (contamination method statement), 6 (ground gasses report), 7 (validation and verification report), 8 (ecology), 9 (nesting birds), 12 (detailed lanscape planting plan), 13 (car parking details), 14 (cycle parking details) 15 (construction method statement), 16 (refuse storage, 17 (dwellingApproval of de number and height limit), 18 (boundary treatments), 19 (proposed levels), 20 (facing materials), 21 (surface water and foul sewerage disposal), 22 (energy efficiency/ renewable energy) and 23 (permitted development removal) on approved application 17/02012/OUT for site B only.