1 Ambleside Close Seaton Delaval Whitley Bay Northumberland NE25 0JD
RETOSPECTIVE: Construction of a wooden fence to the top of the garden wall
51 East Acres Widdrington Station NE61 5NS
RETROSPECTIVE - Construction of porch to front of property, garage to side of property and construction of 1.85m high boundary fence
Thirston Mill West Thirston Morpeth Northumberland NE65 9EH
Construction of a menage; division of the existing field into paddocks with post and rail fencing; hard standing area for vehicle parking; construction of wooden stable block and storage shed.
Land East Of Sewage Treatment Works Coniston Road Riverside Business Park Blyth Northumberland
Certificate of proposed lawful development for the construction of ground mounted Solar PV. The solar panels would be arranged in rows comprising a series of panels facing south on a pile driven racking system. Each panel would be inclined, with the lower part of the panel approximately 800mm from ground level and the highest part approximately 2600mm from ground level. The panels would be on frames supported by uprights. The distance between each row of panels would be 6-8m approximately to avoid any potential for over shadowing Over the course of a year, the majority of the predicted total production of the arrays would be consumed on site by the sewage works. Fencing equivalent to that around the existing sewage works to a height of 2m would be extended around the development. All works to be as shown on submitted site layout plan BLYT/PA003B.
Hazeldene Grange Road Widdrington Station NE61 5LZ
Retrospective : Construction of a garden shed and boundary fencing
Land To South Of 10 Burgham Park Burgham Park Felton Northumberland
Discharge of condition 3 (materials) 5 (construction method statement) and 10 (landscaping and fencing) on approved planning permission 17/01468/FUL.
St Margarets Alnwick NE66 2JG
Construction of 3no. stables plus storage and a post and rail timber fence
Corbridge Middle School Cow Lane Corbridge NE45 5HY
Form new pupil entrance to East and new tarmac pavement, with altered 2.4m high fence and gates. Form new bike park. Replacement of farmers gate to West of yard, with 2.4m oblong mesh set of gates. Erection of 2.4m high oblong mesh fence and gates between central brick outbuilding and caretakers house fence. Construction of 4 new parking spaces in grasscrete type surface. Form new tarmac pavement from West side entrance to school main field.
Hydro Building Queen Elizabeth High School Whetstone Bridge Road Hexham Northumberland NE46 3JD
Non-Material Amendment relating to updated Construction Management Plan (including clarification on delivery timings, amendments to fencing and cabin location, and changes to sequencing and temporary parking) as per Condition 2 (approved plans) and Condition 32 (Construction Method Plan) to approved planning application 19/03998/CCD.
Ray Wind Farm Harle Northumberland
Discharge of Conditions 6 - nest check surveys, Condition 8 - Confirmation that the battery, inverter, transformers and switchgear containers will be light grey. The 2.4m high perimeter fence will be grey, Condition 10 - details of the construction and finish of the new access track on approved planning application 17/01923/RENE