Wadham College Parks Road Oxford Oxfordshire OX1 3PN
External alterations to include re-roofing the spaces above staircases 1 2 3 and the Wardens Lodgings. Installation of insulation over existing rafters and fitting of louvred ventilation outlets. Re-leading of existing dormers. Replacement of rooflights and alterations to fenestration. Internal refurbishment to include repairworks to staircases and upgrading of electrical installation to ground, first, second and third floors of staircases 2 and 3. Formation of en suite bathrooms, removal of partitions and alterations to remaining partitions.
13 And 16-23 And 25-33 Beaumont Street Oxford Oxfordshire OX1 2LP
Alterations and refurbishments to include; guttering; roof tiling and cover, cleaning and repair of stone facades, roof insulation and fenestration sealing.
St Peters College New Inn Hall Street Oxford Oxfordshire OX1 2DL
Erection of an infill of loggia between latner building and harris library with extension to roof overhang. Installation of roof insulation, heat recovery and extract unit. Insertion of 1no. rooflight. Alterations to 1no. window to north elevation.
Christ Church College St Aldate's Oxford Oxfordshire OX1 1DP
Alterations and refurbishment to Batchelor's Row including: shower accommodation; thermal upgrades; framed single glazed windows; roof structure and coverings; lighting protection; trace heating; leak detection; man-safe system of Tom Quad Stairs 5, 6 and 7. Removal and infill of the high level windows.
Balliol College Broad Street Oxford Oxfordshire OX1 3BJ
Refurbishment of basement area of the Bernard Sunley building including music room, lecture room 23, toilets and corridor. Formation of 2no. music and practice rooms as well as a meeting space. Formation of 1no. Accessible toilet. Formation of new roof covering and roof lights to music room. Alterations to windows on the Bernard Sunley building. New services installation including HVEC system, new entrance door & screen, timber external screen and replacement stone stairs to entrance area.
53 Park Town Oxford Oxfordshire OX2 6SL
Erection of a lower ground floor extension and ground floor extension with metal balustrade. Alterations to 1no. window to rear elevation. Render repairs and repointing to front elevation. Insulation of existing roof structure at joist level. (Amended)
Belsyre Court Observatory Street Oxford Oxfordshire OX2 6HU
Clean and repaint the colonnade, Remove existing light fittings from shop frontages. Insert additional lighting into the ceiling of the colonnade and shop frontages and to provide subtle lighting to the front facade. Repair broken stone paving and replace tarmac infill, Installation of new ASHP to existing roof and Installation of new entrance door and alterations to internal entrance lobby. Retaining and refurbishing the existing lift, alterations to internal staircase and installation of new staircase lighting. Alterations to second floor to include; Remove modern suspended ceiling, significantly increasing the height of floor and allowing for modern day ceiling mounted heating/cooling units to utilise original ventilation grilles, removal of partition walls and installation of secondary glazing to existing windows.
Hertford College Catte Street Oxford Oxfordshire OX1 3BW
Alterations to render, drainage, repairs to the roof tiles and sash windows on the north elevation.
Christ Church College, The Deanery St Aldate's Oxford Oxfordshire OX1 1DP
Re-roofing of The Deanery and Fell Tower, Installation of ventilation details to the lead roof. Installation of insulation to roof voids, installation of trace heating and sump pit alarms to the lead gutters. Installation of lightning protection, Alterations to the existing mansafe system. Insertion of draught proofing to the timber windows Localised masonry repairs and external decorations.
Eleanor Lodge Lady Margaret Hall Norham Gardens Oxford Oxfordshire OX2 6QA
Alterations to fenestration to include secondary glazing. Installation of insulation to walls and roof. Installation of mechanical ventilation with heat recovery and 5no air source heat pumps to the roof.