Scholefield House Scholefield Lane Nelson Lancashire BB9 0EP
Approval of Details Reserved by Conditon: Discharge of Condition 3 (Materials), Condition 4 (Construction Method Statement), Condition 5 (Photographic Surveys of Scholefield Lane), Condition 7 (Protective fencing details) of Planning Permission 20/0848/HHO.
Scholefield House Scholefield Lane Nelson Lancashire BB9 0EP
Approval of Details Reserved by Conditon: Discharge of Condition 3 (Materials), Condition 4 (Construction Method Statement), Condition 5 (Photographic Surveys of Scholefield Lane), Condition 7 (Protective fencing details) of Planning Permission 20/0848/HHO.
Land At The Junction With Greenberfield Lane Gisburn Road Barnoldswick Lancashire
Approval of Details Reserved by Condition: Discharge of Conditions 3 (Materials), 5 (Landscaping), 6 (Tree Protective Fencing), 7 (Surface Water Drainage), 8 (Surface Water Pollution Management), 9 (Surface Water Verification Report), 10 (Construction Method), 11 (Construction Access) and 12 (Highway Works) of Planing Permission 21/0012/FUL.
Land At The Junction With Greenberfield Lane Gisburn Road Barnoldswick Lancashire
Approval of Details Reserved by Condition: Discharge of Conditions 3 (Materials), 5 (Landscaping), 6 (Tree Protective Fencing), 7 (Surface Water Drainage), 8 (Surface Water Pollution Management), 9 (Surface Water Verification Report), 10 (Construction Method), 11 (Construction Access) and 12 (Highway Works) of Planing Permission 21/0012/FUL.
Langroyd Hall Langroyd Road Colne Lancashire BB8 7AN
Approval of Details Reserved by Condition: Discharge of Conditions 3 (Remediation), 4 (Construction Method Statement), 5 (Materials), 6 (Materials), 8 (Highways), 14 (Drainage), 15 (Drainage), 16 (Details of Design), 18 (Protective Fencing), 19 (Landscaping), 20 (Archaeology), 21 (Ecology) and 22 (S.106 Obligation) of Planning Permission 19/0893/FUL.
Langroyd Hall Langroyd Road Colne Lancashire BB8 7AN
Approval of Details Reserved by Condition: Discharge of Conditions 3 (Remediation), 4 (Construction Method Statement), 5 (Materials), 6 (Materials), 8 (Highways), 14 (Drainage), 15 (Drainage), 16 (Details of Design), 18 (Protective Fencing), 19 (Landscaping), 20 (Archaeology), 21 (Ecology) and 22 (S.106 Obligation) of Planning Permission 19/0893/FUL.