Parcel R10 Hampton Woods London Road Peterborough
Discharge of condition H5 (construction traffic), H8 (car parking and servicing plan), I4 (childrens play area), I7 (tree protection), J1 (kiln sites), J2C (breaking up of compaction), J6 (PFA dust blow), J14 (radon gas) and L3 (foul drainage) of outline planning permission reference 91/P0556.
Parcel R10 Hampton Woods The Hamptons East Peterborough
Discharge of conditions C6 (haul route and construction access), C8 (tree retention plan), C9 (ripping details), C10 (soil verification phasing plan), C11 (contamination), C12 (contamination verification) and C15 (foul water) in relation to outline planning permission reference 16/02017/OUT
97 Manton Bretton Peterborough PE3 9YU
Variation of conditions C4 (no-dig construction and Arboricultural Method Statement) and C5 (Arb Impact Assessment, Method Statement and Tree Protection Plan) pursuant to planning permission 21/00871/FUL
Castor Business Centre Helpston Road Ailsworth Peterborough Peterborough PE5 7AE
Discharge of conditions C3 (external materials), C4 (ground levels plans), C7 (landscaping & bin storage scheme), C9 (archaeological written scheme of investigation), C10 (tree protection & retention scheme), C12 (construction environmental management plan), C13 (bird & bat boxes details, C14 (contamination assessment), C16 (construction management plan), C17 (bin collection point) of 21/01943/FUL
British Sugar Oundle Road Woodston Peterborough
Discharge of conditions C5 (bird boxes), C9 (vehicular access), C15 (construction covering), C16 (construction environmental management plan), C17 (drainage), C18 (tree protection) and C19 (landscaping) for the housing element only of planning permission 19/00039/FUL
The Silver Jubilee Heltwate Bretton Peterborough
Discharge of condition C2 (materials), C4 (construction trenches), C7 (construction environmental management plan), C8 (fox den method statement), C9 (bird, bug and bat nesting boxes), C13 ( contamination method statement), C16 (arboricultural implications assessment and tree protection) , C17 (tree planting and soft landscaping) , C18 (demolition and contruction management plan), C20 (visibility splays), C22 (fence/gate positions), C24 (external lighting plan), C25 (approved plans) of planning permission reference 20/01025/R3FUL
Peterborough Rugby Union Football Club Second Drove Fengate Peterborough PE1 5XA
Discharge of conditions C3 (Construction Environmental Management Plan) and C8 (Tree Protection Scheme or Plan) of planning permission 21/00022/FUL
130 Culley Court Orton Southgate Peterborough PE2 6WA
Discharge of conditions C3 (materials), C4 (ground & building slab level details), C5 (hard landscaping), C7 (method statement / tree protection plan), C8 (fire hydrants), C9 (construction management plan), C15 (surface water drainage), C17 (cycle parking) and C18 (pedestrian accesses) of planning permission 19/00941/FUL
New Inn House Stamford Road Barnack Stamford PE9 3HA
Demolition of outbuilding, proposed construction of summerhouse including swimming pool, extension to garage to be used as a storage area and associated tree works
Land To The West Of London Road Peterborough
Discharge of condition C2 (Materials), C3 (Hard & Soft Landscaping), C4 (Tree Pits), C13 (Bird & Bat Boxes) and C18 (Construction Management Plan) of reserved matters consent reference 19/01163/REM