Gaywood Solar Farm Land To The North West Of Little Browns Railway Bridge Hilders Lane Edenbridge
Solar photovoltaic farm, comprising PV panels mounted on metal frames, new access tracks, substations, inverter substations, transformer enclosures, switchgear kiosks, storage building, communications building, underground cabling, perimeter fencing with CCTV cameras and access gates, temporary construction compounds and all ancillary grid infrastructure and associated works
Leigh Flood Storage Area River Medway Tonbridge And Malling BC Kent
Details of conditions 2 (design and construction drawings, and method statement), 5 (construction environmental management plan), and 6 (biodiversity enhancement plan) pursuant to planning permission TM/20/01889/FLEA (Proposed flood mitigation improvements to facilitate the Leigh Flood Storage Area (FSA) expansion scheme. Improvements to Leigh and Cattle Arch embankments to include: partial raising of embankments; installation of 300mm high wave return wall; creation of pumping station platform area; erection of new fencing and gates and other associated works that include culvert, eel pass, temporary access and compound areas (SE/20/02463/FUL).