Asphalt Sports Court Parson Cross Park Buchanan Road Sheffield S5 8AL
Construction of synthetic surface sports pitch with welded mesh steel boundary fencing; replacement of floodlighting columns, removal of selected existing boundary fencing, asphalt surfacing and minor vegetation clearance
Land 80M To The West Of 80 Twentywell Lane Sheffield S17 4QE
Construction of new Principal Supply Point (PSP) single-storey building compound incuding 2.3m high security fencing and access gates
Land Adjacent To 2 And To The Rear Of 2 To 12 Little Lane Intake Sheffield S12 2BG
Application to approve details in relation to condition numbers 2. Site Accommodation, 3. Tree Protection Measures, 4. Intrusive Site Investigation Report, 5. Remediation Works, 6. Construction Environmental Management Plan, 7. External Materials/Finishes, 8. Hard/Soft Landscaping, 9. Landscape Works, 10. Approved Remediation Strategy, 11. Boundary Fencing/Street Lighting, and 12. Remediation Strategy; Relating to planning permission 21/01281/FUL
Pitz Soccer Centre Woodbourn Road Athletics Stadium 3 Stadium Way Sheffield S9 3HL
Construction of 6no 3G artificial 5-a-side pitches and 1no 7-a-side pitch including 4.5m perimeter fencing and floodlighting to all pitches
Land To The East Of The Junction With School Street Station Road Mosborough Sheffield S20 5AD
Application to approve details relating to conditions 3. 4. and 5. contaminated land investigation, 6. demolition of Dutch Barn, 7. protected species surveys, 8. Woodland and Ecology Management Plan, 9. fencing, 10. tree protection, 11. fencing to kilns, 12. construction vehicle access, 13. Archaeolgical site investigation, 14. Coal site investigation report, 15. surface water, 16. renewable energy, 17. Brow Improvements, 18. wheel cleaning, 19. details external materials, 20. landscaping, 21. bat detector surveys, 22. remediation strategy, 26. boundary treatments, 27. surface water discharge and 28. vegetation clearance imposed by 19/01394/FUL
The Porter Cottage 286 Sharrow Vale Road Sheffield S11 8ZL
Demolition of small lean-to part of rear barn to form an outside seating area, construction of a fence to enclose bin storage area, provision of festoon lighting to the rear garden area and barn, replacement/repairs to premeter fencing to bin store/yard area and laying of resin bonded gravel to the flooring for use by the public house
Land Bordered By Dike, Rail Lines And Disused Cemetery Between Club Mill Road And Herries Road South Sheffield
Construction of a shared use cycle and pedestrian route connecting Herries Road and Club Mill Road, forming part of the Upper Don Trail. 3m width asphalt surfaced track with seeded verges, associated earthworks, retaining works and timber fencing (Application under Regulation 3 - 1992)
Site Of Former 207 Providence Road Sheffield S6 5BH
Application to approve details in relation to condition numbers, 3. Surface Water Drainage, 4. 30% Reduction in Surface Water, 5. Ingress/Egress of Vehicles, 6. Wheel Cleaning, 7. Ingress/Egress/Site Management, 8. Construction Environment Management Plan, 9. Renewable/Low Carbon Energy, 10. Car Parking Construction Details, 11. External Materials/Finishes, 12. Large Scale Details, 13. Hard/Soft Landscaping, 14. Details of Fencing and 16. Surface Water Drainage on Highway; Relating to planning permission 19/02855/FUL