Sheffield Forgemasters Ltd Steel Works River Don Works Brightside Lane Sheffield S9 2SP
Application to approve details in relation to condition numbers 7. (demolition/groundworks and construction methodology) & 9. (traffic management plan); Relating to planning permission 21/04532/FUL
Ozman Extra Freedom Works 45 - 53 John Street Sheffield S2 4QT
Application to approve details in relation to condition numbers 3. Phase 1 Preliminary Risk Assessment Report, 4. Phase II Intrusive Site Investigation Report, 5. Remediation Strategy Report, 8. Dust Emission, 9. Validation Report, 10. Cycle Parking Accommodation, 11. Disposal Of Litter, 12. Car Parking Accommodation, 13. Wheel Cleaning, 14. Surface Water, 15. Kerb/Footway, 16. External Lighting, 17. External Materials/Finishes, 20. Site Boundary Treatment, 22. Remediation Strategy Revisions, and 23. Audible Construction/Demolition Works; Relating to planning permission 16/01820/FUL
Land Bounded By Rockingham Street And Wellington Street And Trafalgar Street Rockingham Street Sheffield S1 4ED
Application to approve details in relation to condition number(s): 6 (Demolition or Construction Environmental Management Plan), 13 (Vehicular Ingress/Egress), 14 (Site Accommodation) & 17 (Vehicle Cleaning) imposed by planning permission 19/03779/FUL
84 Riverdale Road Sheffield S10 3FD
Application to approve details in relation to condition number: 3. (Demolition & Construction Method Statement) imposed by planning permission 20/04480/FUL
Land To The East Of The Junction With School Street Station Road Mosborough Sheffield S20 5AD
Application to approve details relating to conditions 3. 4. and 5. contaminated land investigation, 6. demolition of Dutch Barn, 7. protected species surveys, 8. Woodland and Ecology Management Plan, 9. fencing, 10. tree protection, 11. fencing to kilns, 12. construction vehicle access, 13. Archaeolgical site investigation, 14. Coal site investigation report, 15. surface water, 16. renewable energy, 17. Brow Improvements, 18. wheel cleaning, 19. details external materials, 20. landscaping, 21. bat detector surveys, 22. remediation strategy, 26. boundary treatments, 27. surface water discharge and 28. vegetation clearance imposed by 19/01394/FUL
Sytner Sheffield Ltd Hollis Croft City Centre Sheffield S1 4BU
Application to approve details in relation to conditions number 4. Demolition Management Plan (DMP)/Construction Environmental Management Plan (CEMP); and 5. Highway Management Plan (HMP) relating to planning permission 18/03977/FUL
Land Bounded By Rockingham Street And Wellington Street And Trafalgar Street Rockingham Street Sheffield S1 4ED
Application to approve details re condition numbers 6. Demolition and Construction Enivironmental Management Plan 13. Ingress and Egress for Constuction Vehicles 14. Site Accommodation Details and 17. Wheel Cleaning imposed by 19/03779/FUL
Bengreave Farm Hollin House Lane Sheffield S6 6RG
Application to approve details in relation to conditions numbered 5. Wheel washing equipment; and 6. Management and routing of vehicles to and from the site during demolition and construction works; relating to planning permission 20/01169/FUL
University Of Sheffield Goodwin Athletics Centre Sports Pitches Northumberland Road Sheffield S10 2TY
Application to extend hours of construction to: 0700 hours-2100 hours Monday to Friday inclusive; 0730 hours-1600 hours Saturday; No work to be carried out on Sundays (Application under Section 74B to vary condition 33 (Construction and demolition works) imposed by planning permission 18/04509/FUL (Erection of a 4-storey higher education facility providing up to 16,550 sq m floorspace with ancillary facilities, associated plant including combined heat and power plant, access and servicing, car parking, cycle lock-up hub and hard/soft landscaping (Class D1 Use, Non-Residential Institution)
Oughtibridge Mill Sheffield Site 22 - 24 Main Road Wharncliffe Side Sheffield S35 0DN
Application to approve details relating to conditions imposed by 1. 2. 3. standard expiry and commencement, 4. approved plans, 5. details of infractructure and enabling works, 6. construction method statement 7. phasing plan, 9. means of crossing over River Don for vehicles,11. tree protection and barrier details and aboricultural method statement,12. written scheme of investigation, 13. vehicular access details for Langsett Road North, 15. details re demolition works Langsett Road North,16. Travel Plan, 20. access to Wharncliffe Side Waste Water Treatment Works, 25. Woodland Management Plan, 26. Ecological Survey mitigation measures, 27. Natural England Licence re demolition, 28. Scheme of Sound Insulation Works, 30. renewable energy, 31. landscape buffer, 33. no more than 320 dwellings 34. site level in accordance with FRA, 35. drainage assessment compliance, 36. remediation strategy compliance, 37. hours restriction on use of plant and machinery for construction and remediation works, 38. vegetated buffer zone and 39. frontage access details 18/04258/OUT