11 Windsor Crescent ULVERSTON LA12 9NP
Single storey rear and side extension forming extended dining room to form sitting area and utility/shower room, part retrospective (Resubmission of SL/2023/0173)
Low Barrows Green Barrows Green KENDAL LA8 0JG
Single storey side extension, change of use of land from agricultural to domestic garden and installation of packaged treatment plant (part retrospective)
10 Bluebell Close KENDAL LA9 7SH
Demolition of existing rear conservatory and erection of a single storey rear extension (Retrospective)
32 Moore Field Close KENDAL LA9 5PH
New porch, rear extension & deck, solar panels, external wall insulation, external storage & shed (Part retrospective)
Wreaks End Farm Barn Duddon Bridge BROUGHTON-IN-FURNESS LA20 6BS
Alterations to a barn and construction of extension, retaining wall and parking area (Retrospective)
99 Hall Park Burneside KENDAL LA9 6RE
Single storey rear extension (Retrospective)
Hawthorn Cottage, Church View Heversham MILNTHORPE LA7 7EN
Refurbishment of a listed building to remove wood-wormed timber and unstable walls refurbish building for modern living and extend the back of the building out to match in with the neighbouring extension to the rear of the old post office on all levels. The front of the building will be unchanged. (Part Retrospective)
Hall More Lodge Caravan Site Hale MILNTHORPE Cumbria LA7 7BP
Extension of a caravan site, laying of stone to accommodate up to six touring caravans, including the provision of up to six hook-up points (Retrospective)
James Cropper Plc, Burneside Mill Burneside KENDAL LA9 6PZ
Installation of new loading bay door and pass door into warehouse extension (Retrospective)
Tony Brown Aggregates, Pennington Lane Lindal-In-Furness ULVERSTON LA12 0LA
Section 73 to planning application 5/20/9007 for extension of the working area of the site to provide for stockpile areas, associated landscaping work (bunds and shrub/tree planting), and the recreation of walls and bunkers within the site (part retrospective). To amend condition 9 to allow the construction of the 5m bunds to be extended in time until 31 October 2024 with the shrub planting to be undertaken by 31 December 2024.