1 Bracon Hall Farm Cottages East Carleton Road Bracon Ash Norfolk NR14 8HN
Construction of a single span bridge over the watercourse to allow vehicular access to property
Lodge Farm Raveningham Road Gillingham Norfolk NR34 0HB
Construction of two private use equine buildings 1 x stable and 1 x barn. Change of use from agricultural to equine (private use).
1 Waveney Close Stoke Holy Cross Norfolk NR14 8HU
Removal of existing open porch and construction of new enclosed porch
Land East Of Main Road Swardeston Norfolk
Construction and operation of Energy Balancing Infrastructure (EBI) comprising energy storage technology, to form up to two areas of modular or containerised structures. To include containerised or modular battery array, transformers and inverter area, switchgear and control room building(s), connection of EBI plant to the Hornsea Three Onshore Converter Station (ONCS), required access and internal roads, drainage systems, perimeter and internal fences, and required external lighting and lightning pylons. Development is located within the Hornsea Three ONCS area as consented by the Hornsea Project Three Offshore Wind Farm Development Consent Order (DCO) in December 2020. The application is accompanied by an environmental statement.
Old Sale Yard Cemetery Lane Wymondham Norfolk
Non material amendment to 2016/2668 - In order to allow a phased construction and delivery of scheme within the required timescales
Old Sale Yard Cemetery Lane Wymondham Norfolk
Non material amendment to 2020/1439 - In order to allow a phased construction and delivery of scheme within the required timescales
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of (8) Landscape Plan, (10) Ecological Management Plan, (17) Code of Construction Practice, (16) Onshore Written Scheme of Investigation (18) Construction Traffic Management Plan
Sherwood Hall Lane Long Stratton Norfolk NR15 2RL
Rear extension and associated alterations to dwelling. Erection of summer house (under construction).
Deal Farm Kenninghall Road Bressingham Norfolk IP22 2HG
Construction of an Anaerobic Digestion facility (part retrospective), comprising: 1 no. digester tank and 1 no. secondary digester/digestate storage tank, silage clamps, liquid and dry feed system; digestate separation, handling and pasteurization, biogas upgrading and mains gas-grid connection; carbon capture, CHP, agricultural building; office buildings, weighbridge, 2 no. covered digestate storage lagoons, and associated plant, vehicular accesses, roads and landscaping (including earth bunds). Revised application following withdrawn planning application 2021/2788.
Land North Of Hethersett Village Centre Little Melton Road Hethersett Norfolk
Details of conditions 15, 16, 17, 18 and 22 of 2011/1804 - condition 15 - construction parking, condition 16 - construction traffic management, condition 17 - wheel washing facilities, condition 18 - interim travel plan and condition 22 - tree protection (in respect of this phase only)