Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (condition) for Provision of (10) Onshore Cable Corridor Ecological Management Plan
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial Discharge of requirements (condition) for Provision of (10) Onshore Converter Station Ecological Management Plan
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Full discharge of requirements (condition) for Provision of (16) Onshore Archaeology for the Onshore Converter Station
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Full discharge of requirements (condition) for Provision of (16) Onshore Archaeology for the Onshore Cable Corridor
Land East Of Main Road Swardeston Norfolk
Construction and operation of Energy Balancing Infrastructure (EBI) comprising energy storage technology, to form up to two areas of modular or containerised structures. To include containerised or modular battery array, transformers and inverter area, switchgear and control room building(s), connection of EBI plant to the Hornsea Three Onshore Converter Station (ONCS), required access and internal roads, drainage systems, perimeter and internal fences, and required external lighting and lightning pylons. Development is located within the Hornsea Three ONCS area as consented by the Hornsea Project Three Offshore Wind Farm Development Consent Order (DCO) in December 2020. The application is accompanied by an environmental statement.
Land North Of Mill Road Alpington Norfolk
Development for four residential bungalows and detached garages together with a new access road and biodiversity area
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of (8) Landscape Plan, (10) Ecological Management Plan, (17) Code of Construction Practice, (16) Onshore Written Scheme of Investigation (18) Construction Traffic Management Plan
12 Bridge Street Loddon Norfolk NR14 6EZ
Lawful Development Certificate for 10 years use of land as a campsite - THIS APPLICATION WILL BE DETERMINED BY THE BROADS AUTHORITY - BA/2022/0344/CLEUD
La Belle Grange Golf Links Road Morley St Botolph Norfolk NR18 9TE
Variation of Condition 2 from 2021/0801 - Re-design the roof on the Garden Room part of the development, removal of part of the pitched section and replacing with flat roof with roof lanterns and a veranda style open porch.
The Deal Ground And Former May Gurney Site The Street Trowse Norfolk
EIA Scoping Opinion for the development of mixed use residential and commercial development.