Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of (8) Landscape Plan, (10) Ecological Management Plan, (17) Code of Construction Practice, (16) Onshore Written Scheme of Investigation (18) Construction Traffic Management Plan
Land To The West Of The Quadram Institute Rosalind Franklin Road Colney Norfolk
Reserved Matters Application for appearance, landscaping, layout and scale of development following Outline permission 2012/1880: Construction of Diagnostic Assessment Centre (Class Ee), with associated disabled car parking, highway works, drainage works and landscaping, together with the partial discharge of conditions 2 (reserved matters), 4 (surface water drainage), 5 (foul drainage), 19 (landscaping), 21 (tree protection) and 23 (archaeology) of outline planning permission ref 2012/1880/O (in respect of this phase only). (The outline submission included an Environmental Statement)
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of Ecological Management Plan (10), Construction Traffic Management Plan (18), Onshore Written Scheme of Investigation (16), Landscape Plan (8) & Code of Construction Practice (17): for Pre-construction Environmental Surveys and Pre-construction Land Drainage Surveys
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of Landscaping (8), Ecological Management Plan (10), Onshore Archaeology (16), Code of Construction Practice (17) and Construction Traffic Management Plan (18) - For pre-construction Archaeological Investigations
Land East Of Cranes Road Hethel Norfolk
Proposed Development for installation and operation of ground-mounted solar farm and energy storage system. together with inverter platforms; control room; DNO station; storage containers; battery storage; security fencing & CCTV; temporary construction compound; and enhanced landscaping & ecological management.