Land To The West Of The Quadram Institute Rosalind Franklin Road Colney Norfolk
Reserved Matters Application for appearance, landscaping, layout and scale of development following Outline permission 2012/1880: Construction of Diagnostic Assessment Centre (Class Ee), with associated disabled car parking, highway works, drainage works and landscaping, together with the partial discharge of conditions 2 (reserved matters), 4 (surface water drainage), 5 (foul drainage), 19 (landscaping), 21 (tree protection) and 23 (archaeology) of outline planning permission ref 2012/1880/O (in respect of this phase only). (The outline submission included an Environmental Statement)
Land To The North And South Of Rightup Lane Wymondham Norfolk
Reserved matters following outline permission 2012/0371/O for the construction of vehicular and pedestrian access points, network of pedestrian and cycle routes, informal public open spaces, formal sports provision, play spaces, location of pumping station, biodiversity measures, strategic planting and grassland, allotments, orchard and sustainable drainage ponds, basins and swales.
Former Wymondham Rugby Club Tuttles Lane East Wymondham Norfolk
Reserved Matters details for appearance, landscaping, layout and scale following outline permission 2014/0799, for the construction of 90 residential dwellings including demolition of existing Wymondham Rugby Club building and sports pitches. The closure of Tuttles Lane access and creation of a new primary access from Lavender Road and associated works including open space, sustainable drainage systems, landscaping, infrastructure and earthworks. (The outline submission included an Environmental Statement)
Land South Of Devon Way And Hudson Avenue Trowse Norfolk
Reserved matters for construction of 75 dwellings with associated accesses, parking, infrastructure, open space and land set aside for future primary school use following outline consent 2014/0981
Former IFR Site Norwich Research Park Colney Lane Colney Norfolk
Reserved matters application for construction of internal footpaths with associated lighting following outline consent 2012/1477 (for this phase only). This outline submission included an Environmental Statement