Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (condition) for Provision of (10) Onshore Cable Corridor Ecological Management Plan
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial Discharge of requirements (condition) for Provision of (10) Onshore Converter Station Ecological Management Plan
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Full discharge of requirements (condition) for Provision of (16) Onshore Archaeology for the Onshore Converter Station
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Full discharge of requirements (condition) for Provision of (16) Onshore Archaeology for the Onshore Cable Corridor
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of (8) Landscape Plan, (10) Ecological Management Plan, (17) Code of Construction Practice, (16) Onshore Written Scheme of Investigation (18) Construction Traffic Management Plan
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of Ecological Management Plan (10), Construction Traffic Management Plan (18), Onshore Written Scheme of Investigation (16), Landscape Plan (8) & Code of Construction Practice (17): for Pre-construction Environmental Surveys and Pre-construction Land Drainage Surveys
The Bungalow Station Road Spooner Row NR18 9JR
Discharge of conditions of permission 2021/1757 - Condition 11: Surface Water Drainage Scheme. Condition 12: Foul Water Strategy. Condition 13: details of the existing ground levels, proposed finished floor levels, and the proposed finished ground levels of the site, relative to a datum point which is to remain undisturbed during the development. Condition 16: Tree Protection Plan.
Hornsea Project Three Offshore Wind Farm
National Infrastructure Development Consent Order for Hornsea Project Three Offshore Wind Farm (Planning Inspectorate Reference: EN010080) Partial discharge of requirements (conditions) for Provision of Landscaping (8), Ecological Management Plan (10), Onshore Archaeology (16), Code of Construction Practice (17) and Construction Traffic Management Plan (18) - For pre-construction Archaeological Investigations
Thickthorn Park And Ride Norwich Road Hethersett Norfolk
Installation of a 20m high telecommunications monopole and wraparound cabinet, supporting 6no. antenna apertures and 2no. 600mm transmission dishes, plus the installation of 6no. ground-based equipment cabinets, and ancillary development thereto.
Land East Of A11 And North And South Of Round House Way Cringleford Norfolk
Discharge of Conditions 38 and 48 of planning application 2017/2120: Energy Efficiency Statement (Phase 8 and Phase 9 of Site B in accordance with overarching development calculation for Site B) and Noise Assessment and Mitigation (Phase 8 and Phase 9 of Site B).