Unit 428 Oakshott Place Walton Summit Industrial Estate Bamber Bridge Preston Lancashire PR5 8AU
Lateral reduction from units to reduce overhang from units 417.419,422 and 423 at Oakshott Place in accordance with BS3998 2010. Remove 1 x dead ash between units 417 and 419 - South Ribble BC TPO 25 (Surrounding Ranglet Road Walton Summit Industrial Estate Bamber Bridge Lancashire) 2006
Atlantic Industries Unit 6B Bannister Hall Works Bannister Hall Lane Higher Walton Preston Lancashire PR5 4DB
Extension to the existing Industrial Building (Use Class B8: Storage and Distribution)
Broomfield Landscapes Naptha Lane Whitestake Preston Lancashire PR4 4JY
Proposal for demolition of 2no. existing units and erection of 1 no. Small building consisting of 5no. small industrial units
Land East Of The A59 Wendover Gill Lane Longton Preston Lancashire PR4 4SR
Change of use of land to storage and parking, engineering works to form a hardstanding and erection of a 2.4m high security fence, in association with existing industrial estate
Wendover Gill Lane Longton Preston Lancashire PR4 4SR
Proposed replacement industrial units
Carver Hey Farm Moss Lane Little Hoole Preston Lancashire PR4 4SX
Outline Application for residential development of up to 20 dwellings (Appearance, Landscaping, Layout and Scale applied for) following demolition of existing industrial/commercial units
Leyland Trucks Limited Croston Road Farington Moss Leyland Lancashire PR26 6LZ
Works to provide a temporary truck storage area within the curtilage of the existing industrial / warehouse buildings, through the provision of metal plates upon an existing area of grass.
Autoy Limited Bannister Hall Lane Higher Walton Preston Lancashire PR5 4DZ
Proposed front extension to industrial unit
17 Centurion Way Farington Leyland Lancashire PR25 3BF
TPO 2012 No. 1 at Land at the junction of Centurion Way and Centurion Industrial Estate. Reduce Beech tree to previous pruning points as identified on application. Crown raise single sycamore tree by removing two lowest branches as identified on application.
Test Track Aston Way Moss Side Industrial Estate Leyland Lancashire PR26 7TZ
Discharge of conditions 52 (partial) and 53 (full) pursuant to planning permission 07/2017/3361/ORM - hybrid planning application comprising of Full and Outline development - Environmental Impact Assessment (EIA) development, Part A FULL - Site enabling works, the development of highway and drainage infrastructure for the full application site (the proposed development site) and the provision of car park accessed off Titan Way (Phase 1); together with the construction of 197 dwellings and associated internal access roads, public open space, green infrastructure, an acoustic barrier and highway infrastructure (Phase 2) , Part B OUTLINE - for the remainder of the proposed development site for the development of between 653 and 753 new homes, up to 5,000 sqm of Business Park (Use Classes B1); up to 15,000 sqm of Use Class B2 and up to 8,000 sqm Industrial Estate (Use Class B8), local centre comprising up to 3,000 sqm of accommodation for occuption within any combination of uses within Classes A1,A2,A3, A4,A5,B1 or D1 (including health centre/clinic) (which shall not exceed 2,500 sqm of main town centre uses), a primary school (1.646ha) and associated public open space and green infrastructure (Phases 3-5 and education, employment and local centre phases).