Morrisons Lysander Road Yeovil Somerset BA20 2AU
Discharge of Condition Numbers 3 (Construction Management Plan), Condition 4 ('Arboricultural Method Statement' and a 'Tree Protection Plan'), Condition 5 (Soft Landscaping and Planting Scheme') and Condition 6 (Cycle Parking spaces) of planning application 21/02397/FUL
Land Os 3875 Part Rod Lane Ilton Ilminster Somerset TA19 9ET
Discharge of Condition Nos 3 (CEMP), 4 (Disposal of Surface Water), 5 (Highways Details),12 (Construction Method Statement), 13 (CEMP:Biodiversity) and 19 (Surface Water Drainage Scheme) of planning application 19/03505/FUL
The Priory North Street Stoke Sub Hamdon Somerset TA14 6QP
Discharge of Conditions No. 3 (Drainage), No. 4 (Lighting), No. 5 (Deliveries) No. 6 (BEP), No. 7 (Birds), No. 8 (Hedgerows), No. 9 (Construction Method), No 10 (Structural Timbers or roof), No. 11 (Design), No. 12 (Archaeological Field Evaluation) and No. 13 (Ecological Assessment Report) of Planning Application 22/02866/FUL.
Land At Downslade Farm Downslade Lane Long Sutton Langport Somerset TA10 9JL
Discharge of Condition Nos 4 (Ecologist Report), 5 (Vegetation Works and Maintenance in Construction area), 8 (Landscaping Scheme), 9 (Hedge and Tree Management Plan), 12 (Proposed Access) and 13 (Surface Water Disposal) of planning application 22/01261/FUL
Land South Of KitHill Crewkerne Somerset
Part Discharge of Conditions No.6 (Construction Traffic Plan), No.8 (Water Drainage), No.9 (Internal Ground Levels) and Full Discharge of Condition of No.7 (Scheme of Investigation) on Planning Application 18/01737/OUT.
Land At Long Hazel Farm High Street Sparkford Yeovil Somerset
Discharge of conditions 3 (Materials), 4 (Floor Levels), 5 ( Proposed Planting Scheme), 6 (Constructions Management Plan), 7 (Drainage), 8 (Drainage), 9 (Biodiversity), 11 (Travel Plan), 13 (Archaeology Report), and 14 (Construction details) of approval 17/02046/FUL.
Land Os 4562 Ducks Hill Langport TA10 9EN
S73 application to vary Condition 2 (approved plans) of 17/04828/FUL, to allow substitution of plans to amend the design of dwellings and to discharge conditions 3 (Materials), 4 (Construction Management Plan), 5 (Access Construction), 6 (Roads, footways etc construction), 7 (Surface Water and Foul Drainage) and 9 (Surface Water and Foul Drainage)