Himley House Hotel Wolverhampton Road Himley DUDLEY DY3 4LD
Erection of raised terrace, glazed veranda and garden arbours, construction of 3 no. patio islands with festoon lighting, extension to existing paths and repair of existing walls and fences to northern garden; removal of existing building mounted awning, removal of ivy from building and demolition of modern porch to eastern elevation; removal of decking and installation of new patio with festoon lighting, new gate and repairs to boundary wall to southern / function room garden; installation of car park barriers; new external lighting; new external flue and creation of new landscape beds and footpaths within car park
Himley House Hotel Wolverhampton Road Himley DUDLEY DY3 4LD
Erection of raised terrace, glazed veranda and garden arbours, construction of 3 no. patio islands with festoon lighting, extension to existing paths and repair of existing walls and fences to northern garden; removal of existing building mounted awning, removal of ivy from building and demolition of modern porch to eastern elevation; removal of decking and installation of new patio with festoon lighting, new gate and repairs to boundary wall to southern / function room garden; installation of car park barriers; new external lighting; new external flue and creation of new landscape beds and footpaths within car park
Roost Farm Ebstree Road Seisdon WOLVERHAMPTON WV5 7ES
For the proposed conversion of an agricultural building to one dwellinghouse together with access, landscaping and demolition of existing stable block to form garage block
West Midlands Interchange Watling Street/Wolverhampton Road Gailey
The West Midlands Rail Freight Interchange Order 2020 (as amended by The West Midlands Rail Freight Interchange (Correction) Order 2020) Discharge of Requirement 4 (Detailed Design Approval) parts (b) and (h), Discharge of Requirement 5(1) - Demolition and Construction Environmental Management Plan (ref: WMI-WCL-EQ-XX-RP-LE-300008), Requirement 5(1) - Noise and Vibration Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300003 Rev P04), Requirement 5(1) - Dust Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300003 Rev P03), Requirement 5(1) - Water Management Plan (ref: WMI-WCL-EWE-XX-RP-LE-300003 Rev P03), Requirement 6(2) (Continued Access to WCML), Requirement 12(1) - Environmental Mitigation and Management Plan produced by Delta Simons dated March 2023, Requirement 15(1) - Earthworks Strategy Phase 2B produced by Burrows Graham (ref: WMI-BGL-GEN-XX-RP-CE-060011), Requirement 16(1) - Written Landscaping Scheme produced by FPCR dated March 2023, Requirement 24(2) - Temporary Construction Signage (refs: WMI-TSM-TTM-ZZ-DR-CH-010006, WMI-TSM-TTM-ZZ-DR-CH-010007, WMI-TSM-TTM-ZZ-DR-CH-010008)
Former Great Wyrley Community Support Unit 156 Walsall Road Great Wyrley Staffordshire WS6 6NQ
Demolition of existing buildings and redevelopment of site to deliver a 90 bedroom Residential Care Home (C2 Use Class) and 32 Age Limited Apartments (over 55) (C2 Use Class) with car parking, landscaping and associated infrastructure including alterations to vehicle access from Walsall Road
West Midlands Interchange Watling Street/Wolverhampton Road Gailey
The West Midlands Rail Freight Interchange Order 2020 (as amended by The West Midlands Rail Freight Interchange (Correction) Order 2020) - Discharge of Requirement 4 (Detailed Design Approval) parts (b) and (h), Requirement 5(1) - Demolition and Construction Environmental Management Plan (ref: WMI-WCL-EQ-XX-RP-LE-300002) Requirement 5(1) - Noise and Vibration Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300002), Requirement 5(1) - Dust Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300002), Requirement 5(1) - Site Waste Management Plan (ref: WMI-WCL-EGN-XX-RP-LE-300006), Requirement 6(2) (Continued Access to WCML), Requirement 12(1) - Environmental Mitigation and Management Plan produced by Delta Simons dated 22 February 2023, Requirement 15(1) - Earthworks Strategy Phase 2A produced by Burrows Graham (ref: WMI-BGL-GEN-XX-RP-CE-060010), Requirement 16(1) - Written Landscaping Scheme produced by FPCR dated February 2023, Requirement 24(2) - Temporary Construction Signage (refs: WMI-TSM-TTM-ZZ-DR-CH-010006, WMI-TSM-TTM-ZZ-DR-CH-010007, WMI-TSM-TTM-ZZ-DR-CH-010008) and Requirement 27(1) (Surface Water Drainage Scheme), in connection with Earthworks
Garages Site CP4 Mitre Road Cheslyn Hay Staffordshire
Demolition of existing garages and access hard standing and the construction of 6no. apartments and associated hardscaping, landscaping and parking court.
The Four Ashes Inn Station Drive Four Ashes Staffordshire WV10 7BU
Demolition of modern extensions to the public house and conversion of its historic elements to two dwellings, erection of seven dwellings, associated parking access, parking and landscaping, and retention of playing fields, play area, pavilion and car park
Wombourne High School Ounsdale Road Wombourne Staffordshire WV5 8JJ
Demolition of two school buildings and the construction of a new two-storey school building and temporary teaching block, with associated landscaping and external play areas (major)
Bridge Farm Long Street Wheaton Aston Staffordshire ST19 9NF
Full Planning Application for the demolition of the existing agricultural buildings and the construction of 21 dwelling houses with associated accesses, landscaping and infrastructure.