Himley House Hotel Wolverhampton Road Himley DUDLEY DY3 4LD
Erection of raised terrace, glazed veranda and garden arbours, construction of 3 no. patio islands with festoon lighting, extension to existing paths and repair of existing walls and fences to northern garden; removal of existing building mounted awning, removal of ivy from building and demolition of modern porch to eastern elevation; removal of decking and installation of new patio with festoon lighting, new gate and repairs to boundary wall to southern / function room garden; installation of car park barriers; new external lighting; new external flue and creation of new landscape beds and footpaths within car park
Himley House Hotel Wolverhampton Road Himley DUDLEY DY3 4LD
Erection of raised terrace, glazed veranda and garden arbours, construction of 3 no. patio islands with festoon lighting, extension to existing paths and repair of existing walls and fences to northern garden; removal of existing building mounted awning, removal of ivy from building and demolition of modern porch to eastern elevation; removal of decking and installation of new patio with festoon lighting, new gate and repairs to boundary wall to southern / function room garden; installation of car park barriers; new external lighting; new external flue and creation of new landscape beds and footpaths within car park
Garage Site Rear Of 1-29 Bull Lane Link Road Wombourne
Condition 3 - External Materials - HT1 Condition 3 - External Materials - HT1.1 Condition 3 - External Materials - HT1.2 Condition 3 - External Materials - HT2 Condition 4 - Construction Management Plan Condition 5 - Drainage Plan Condition 8 - Hard and Soft Landscaping Plan Condition 9 - Boundary Treatment Plan
Former Royal Ordnance Factory Cat And Kittens Lane And Brookhouse Lane Featherstone
Reserved matters application for the construction of employment development (Use Class E, B2 and B8) for Plots 1-8, including details of appearance, scale, landscaping, layout, and the routing and profile of the internal access road, along with all associated works.
West Midlands Interchange Watling Street/Wolverhampton Road Gailey
The West Midlands Rail Freight Interchange Order 2020 (as amended by The West Midlands Rail Freight Interchange (Correction) Order 2020) Discharge of Requirement 4 (Detailed Design Approval) parts (b) and (h), Discharge of Requirement 5(1) - Demolition and Construction Environmental Management Plan (ref: WMI-WCL-EQ-XX-RP-LE-300008), Requirement 5(1) - Noise and Vibration Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300003 Rev P04), Requirement 5(1) - Dust Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300003 Rev P03), Requirement 5(1) - Water Management Plan (ref: WMI-WCL-EWE-XX-RP-LE-300003 Rev P03), Requirement 6(2) (Continued Access to WCML), Requirement 12(1) - Environmental Mitigation and Management Plan produced by Delta Simons dated March 2023, Requirement 15(1) - Earthworks Strategy Phase 2B produced by Burrows Graham (ref: WMI-BGL-GEN-XX-RP-CE-060011), Requirement 16(1) - Written Landscaping Scheme produced by FPCR dated March 2023, Requirement 24(2) - Temporary Construction Signage (refs: WMI-TSM-TTM-ZZ-DR-CH-010006, WMI-TSM-TTM-ZZ-DR-CH-010007, WMI-TSM-TTM-ZZ-DR-CH-010008)
West Midlands Interchange Watling Street/Wolverhampton Road Gailey
The West Midlands Rail Freight Interchange Order 2020 (as amended by The West Midlands Rail Freight Interchange (Correction) Order 2020) - Discharge of Requirement 4 (Detailed Design Approval) parts (b) and (h), Requirement 5(1) - Demolition and Construction Environmental Management Plan (ref: WMI-WCL-EQ-XX-RP-LE-300002) Requirement 5(1) - Noise and Vibration Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300002), Requirement 5(1) - Dust Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300002), Requirement 5(1) - Site Waste Management Plan (ref: WMI-WCL-EGN-XX-RP-LE-300006), Requirement 6(2) (Continued Access to WCML), Requirement 12(1) - Environmental Mitigation and Management Plan produced by Delta Simons dated 22 February 2023, Requirement 15(1) - Earthworks Strategy Phase 2A produced by Burrows Graham (ref: WMI-BGL-GEN-XX-RP-CE-060010), Requirement 16(1) - Written Landscaping Scheme produced by FPCR dated February 2023, Requirement 24(2) - Temporary Construction Signage (refs: WMI-TSM-TTM-ZZ-DR-CH-010006, WMI-TSM-TTM-ZZ-DR-CH-010007, WMI-TSM-TTM-ZZ-DR-CH-010008) and Requirement 27(1) (Surface Water Drainage Scheme), in connection with Earthworks
The Cottage Wolverhampton Road Dunston Staffordshire ST18 9AB
Construction of building and exercise arena with associated landscaping and hardstanding surfaces, for equestrian use.
Garage Site Cotswold Avenue Great Wyrley Staffordshire WS6 6BU
Discharge of Conditions 5 - Materials, 7 - Landscape Scheme, 8 - Boundary Treatment, 9 - Construction Environmental Management Plan, 10 - Ecological Enhancement Plan, 11 - External Lighting, 12 - Drainage
Garages Site CP4 Mitre Road Cheslyn Hay Staffordshire
Demolition of existing garages and access hard standing and the construction of 6no. apartments and associated hardscaping, landscaping and parking court.
New House Farm Gunstone Lane Codsall Staffordshire WV8 1EL
Discharge of conditions:- Condition 4 Landscaping Scheme Condition 6 Tree Protection Measures in AIA Condition 7 Drainage runs and excavations Condition 10 Biodiversity Enhancement Condition 11 Construction Method Statement Condition 12 External Lighting Scheme