Land North Of Wobaston Road Pendeford
Phase 1 - Incorporation of a landscaped Recreational Area to the Eastern side between Car Park and Service Yard. - Removal of Solar Shading to North and East Fa?ades of Main Office Reception. - Change from Helical to Straight Stair within the Reception Area (internal alteration only). - Reconfiguration of WCs across Ground and First Floor (internal alterations only). - Reconfiguration of Food Preparation Area (internal alterations only). - Relocation of Air Handling Unit (AHU) machinery to east elevation. - Relocation of 6 No. trees within northern car park to nearby soft landscaping. - Fall arrest system added onto the roof. - Ridge level altered by +140mm to reflect actual Steelwork and structure (raising level from 13.70m to 13.84m). - Kiln Chimney Flues added to drawing. Max height now 17m above finished floor level. - Minor alterations to cladding on the Proposed Elevations as described in the Key Legend. This includes increase in height of Raw Materials Store. Several operational doors have been altered to serve Users Operational Requirements. - Louvres have been indicated on the Proposed Elevations in accordance with M E Ventilation Systems Requirements. - Glass canopy added to Secondary Office main entrance & Drivers Waiting Area access door. - FF & SF Main office extended to GL T. Added mezzanine between GL's T-X. Phase 2 - As above.
New House Farm Gunstone Lane Codsall Staffordshire WV8 1EL
Discharge of conditions:- Condition 4 Landscaping Scheme Condition 6 Tree Protection Measures in AIA Condition 7 Drainage runs and excavations Condition 10 Biodiversity Enhancement Condition 11 Construction Method Statement Condition 12 External Lighting Scheme
Sunnydale Dark Lane Cross Green WOLVERHAMPTON WV10 7PN
Discharge of Conditions 3 (materials and joinery), 4 (drainage plans), 5 (floor levels), 6 (boundary treatment), 7 (landscape scheme), 11 (tree and hedgerow protection plan) of permission 17/00716/FUL
Centre Of Pond 261M From Lapley Manor, Church Lane 23M From Church Lane Church Lane Lapley Staffordshire ST19 9JS
Retrospective consent for erection of replacement entrance gates, erection of windmill pool aeration unit and tree mounted security cameras (2no.) together with the creation of 2 no. additional private fishing pools with associated landscaping
Land North West Of Stafford Road Penkridge Staffordshire
Amendment to soft landscape proposals showing the planting of 6 additional trees (total 27)
Land Adjacent 18 Hillboro Rise Kinver Staffordshire DY7 6BS
Discharge of Conditions: Condition 3- Landscaping proposals are submitted with this application. Condition 5- The location of tree protection fencing is shown on the Tree Protection Plan within the Arboricultural Report submitted with this application. Condition 6- There is no construction work, drainage runs and excavation work proposed within the protective fencing/root protection areas of retained trees. Condition 10- A materials scheduled is submitted with this application. Condition 15- Boundary treatments are shown on drawing 20009/4B submitted with this application.
Three Hammers Golf Complex Old Stafford Road Cross Green Staffordshire WV10 7PP
Discharge of Condition 4 (scheme for flood compensation), 5 (site percolation test), 9 (course section, design and layout), 10 (landscape plan), 12 (kiosk materials), 15 (excavations), 18 (tree protection), 19 (there is no work within Root Protection areas), 22 (lighting), 23 (bat roost assessment), 24 (wildlife ramp)
Land Adjacent To Lane House Club Lane Coven Heath Staffordshire WV10 7EW
Discharge of Conditions: 3 Materials, 4 5 6 Trees, 7 8 9 Landscaping, Parking and Access, 10 Construction Method Statement, 12 Drainage
Holly House Bickford Road Whiston Staffordshire ST19 5QH
Discharge of Condition 3 (Materials), Condition 4 (Building Record and Analysis), Condition 5 (Construction Method), Condition 6 (Landscape Scheme), Condition 7 (Tree Survey), Condition 9 (Bat Survey), and Conditions 10 and 11 (Bird Housing)
Land At Broad Lane Springhill Staffordshire
Discharge of Conditions: 6 - Hard and Soft Landscaping, 7 - Landscape Management Plan, 9 - Tree Removal, 15 and 16 - Ecological Mitigation Strategy and Tree Felling