Go Outdoors Third Avenue Southampton SO15 0LD
Change of use of existing building from retail (Class E) to a flexible general industrial or storage or distribution warehouse use (class b2/b8) including ancillary office space, together with associated external alterations and provision of associated access, landscaping, car parking and servicing areas.
71 Bridge Road Southampton SO19 7GR
Change of Use of the existing office building (Class B1a) into 2x 2 bedroom flats (Class C3), erection of external covered stairs to south elevation, new boundary wall and landscaping to front and north side elevations, with associated amenity space and bin and cycle storage.
Newspaper House Test Lane Southampton SO16 9JX
Redevelopment of the site. Demolition of existing buildings and the erection of three buildings for use as either general industrial (Use class B2) and/or storage and distribution (Use Class B8) with ancillary office accommodation, together with associated access, parking and landscape and infrastructure works (departure from the Development Plan)
Southampton City College St Mary Street Southampton SO14 1AR
External alterations associated with refurbishment of building for office administration use, including changes to fenestration, improvements to accessibility and landscaping of external yard (submitted in association with 20/01652/LBC).
First Church of Christ Scientist 30-32 The Avenue Southampton SO17 1XN
Redevelopment of the site for a residential facility comprising a two storey main building with reception, office, ancillary consulting, cafe and meeting rooms, a two storey residential building to the rear and landscaping following demolition of existing buildings.
Unit 1 Marine Employment Quarter Keel Road Southampton SO19 9UY
Installation of mezzanine floor; external alterations including, proposed projecting portal feature, glazed entrance screen and revolving door, additional windows, louvres and doors, together with alterations to existing office windows on the north and east elevations; and external works associated with revised building access / egress points, relocated and additional vehicular parking, relocated and additional cycle parking, additional electric vehicle charging points, generator, bin storage and plant area, together with raised planters for soft landscaping (amended description).