Carlton Grove Corner Space Fronting Meeting House Lane SE15
Details of Condition 3 (Arboricultural Method Statement), as required by planning permission 18/AP/2585 (Public realm improvements along Meeting House Lane -upgrades to shop front at Acorn Parade including new cladding and integrating lighting to undercroft access towards Willowdene housing and to west elevation of the building; -demolition of low level boundary treatment of surrounding green areas; replacement with new Corten steel boundary treatment and introduction of new landscaping; -installation of new Corten steel refuse bins and refurbishment of existing refuse collection areas; -installation of a new Multi-use Games Area with boundary fencing, within the south side of Carlton Grove.)
Carlton Grove Corner Space Fronting Meeting House Lane SE15
Details of Condition 4 (Hard and Soft Landscaping Scheme), as required by planning permission 18/AP/2585 (Public realm improvements along Meeting House Lane -upgrades to shop front at Acorn Parade including new cladding and integrating lighting to undercroft access towards Willowdene housing and to west elevation of the building; -demolition of low level boundary treatment of surrounding green areas; replacement with new Corten steel boundary treatment and introduction of new landscaping; -installation of new Corten steel refuse bins and refurbishment of existing refuse collection areas; -installation of a new Multi-use Games Area with boundary fencing, within the south side of Carlton Grove.)
82 Grove Park London Southwark SE5 8LE
Non-material amendment of planning permission LBS reg no 18/AP/3805 Demolition of front garage and construction of front-side extension, incorporating a rooflight and flat roof; erection of a front porch enclosure including a replacement front entrance door; replacement of all windows to front and rear elevations; landscaping of front garden including the installation of new boundary fencing. A side extension at second floor level; including replacement of roof terrace fencing; hip-to-gable extensions to the south and north facing rooflsopes incorporating a rooflight to the front roofslope; and landscaping to the rear garden.
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of condition 4 (Construction Management Plan) of planning permission ref. 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of Condition 8 - Partial discharge of detailed drawings of a hard and soft landscaping scheme required by planning permission dated 29/11/2018 [LBS Ref 18/AP/2840] for 'Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts'.