The London Power Tunnels II - Circuit 2 - New Cross To Hurst Southwark
Discharge of Schedule 2 (2) - "Environmental Assessment Report" (Basement Impact Assessment only) of the Section 106 agreement relating to planning permissions 18/AP/0463 and 18/AP/0464 (Request for a EIA Screening Opinion in respect of the proposed for London Power Tunnels Circuit 1 (Wimbledon to New Cross) including temporary works (a construction site of approximately 15,000sqm) and permanent works (one head-house approx 15m x 15m and 10m maximum height; 30m deep access shaft approx 15m diameter; and 3200m length of 4m diameter tunnel to Lambeth/Southwark boundary and a 10m length of 4m diameter tunnel to connect to Circuit 2).
Land Off Potters Fields London SE1 2SG
Discharge of details of "Site investigation" as required by Part (a) to (c) of Condition 5 of the planning permission 18/AP/1513 (Variation of Condition 2 (approved plans) and the removal of Condition 5 (Arboricultural Impact Assessment) of planning permission dated 8/1/2018 [LBS Ref 17/AP/3998] for construction of a six-storey dwelling house with a basement and roof terrace. The main amendments proposed are: -Reduction in the floor to ceiling heights to 2.7m (still easily exceeding the Council's minimum standards), which enables an additional storey to be fitted into the consented envelope. -Variations to the footprint of the building to the north and south to extend to the site boundary. -Design of the elevations and roof terrace canopy revised.)