Bells Gardens Community Centre 19 Buller Close London Southwark SE15 6UJ
Non material amendments for planning application ref: 21/AP/1077 dated 29/01/2022 for: (demolition of existing community centre and the construction of three new buildings consisting of a 7 stories, 6 stories and 5 stories to provide a retail unit fronting onto Commercial Way, and provision of 83 new Council homes, alongside the provision of the existing community facilities on the site as well as new landscaped areas including MUGA and playspace). To allow: -Removal of 2 existing Lime trees and replacement planting and their replacement with five new trees (comprising 2 x Tilia Cordata 'Greenspire' 30-35cm 350L and 3 x Tilia Cordata 'Greenspire' 20-25cm 250L) as specified by the Council's Tree Officer.
Plot H11B Elephant Park London Southwark SE17 1JL
Details of condition 26 (Tree protection) part b only for Plot H11B as part of construction phase MP4 as required by planning ref. 12/AP/1092 (Outline application for: Redevelopment to provide a mixed use development comprising a number of buildings ranging between 13.13m (AOD) and 104.8m (AOD) in height with capacity for between 160,579sqm GEA (min) and 254,000sqm GEA (max) residential floorspace together with retail (Class A1-A5), business (Class B1), leisure and community (Class D2 and D1), energy centre (sui generis) uses. New landscaping, park and public realm, car parking, means of access and other associated works).
150-154 Borough High Street London Southwark SE1
RESUB- Detail of Condition 3-Tree survey - proposed works/protection as required by full planning permission ref 19/AP/1173 dated 21/03/2022 for minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant. Condition 3 Arboriculture 22/AP/1008 Oliver Stutter The condition is being re-submitted purely so that it can be discharged under the new S73 reference 21/AP/0960
Plot H11A Within Land Bound By New Kent Road To The North Rodney Place To The East Plot H11B And Elephant Park To The South And Plot H5 To The West
Non-material amendments to reserved matters approval ref. 19/AP/2116 dated 15/1/2020 (approval of reserved matters (appearance, layout and scale only) for Plot H11A within Elephant Park submitted pursuant to the outline planning permission ref. 12/AP/1092. The proposal comprises the construction of three buildings ranging between 10 and 19 storeys in height (maximum height 66.8m AOD) comprising 222 residential units, 1,421.8 sqm (GEA) flexible retail, office, community and leisure (A1-A5/B1/D1/D2) uses, wheelchair accessible parking, cycle storage, servicing, plant areas, landscaping, new public realm, and other associated works, with a revised facade design, a revised ground floor layout, revised floorspace figures and a reduction in maximum height to those approved by reserved matters approval ref. 18/AP/1862 for Plot H11a). The proposed changes are to: Building C (tower) to change from a glazed balustrade to metal at level 18 and podium, the level 18 curtain wall and crown, and the PPC banding depth to all levels; to Buildings A and B mansion blocks their parapet design, window size reducation and pre-cast banding depth to all levels; and curtain wall configuation (including increasing the depth of louvres) across the plot.