54 Dulwich Village London Southwark SE21 7AJ
Listed building concent for erection of rear infill extension and adjustment of existing rear extension height. Replacement of the rear extension roof lantern with a low profile skylight and addition of 2 no. low profile skylights . Replacing 3 existing domed skylights with 2no. low-profile skylights to the existing front facing extension. Elevational repairs and upgrades including the re-rendering of the property with breathable lime render and addition of decorative mouldings. Replacement and repositioning of uPVC doors and windows with traditional style timber sash windows and timber doors and the reinstatement of a clerestory window. Roof alterations including the replacement of existing front ground floor extension with lead grey EPDM and rear extension roof with sedum, and replacement of felt and copper roof to the main property with a lead grey single ply membrane roof and the addition of 3no. conservation style skylights to the main roof. Internal remodelling works proposed.
75-76 Blackfriars Road London Southwark SE1 8HA
Partial demolition, extension and internal and external refurbishment of Grade II listed building to improve accessibility and to change current layout to suit new hotel use works include lowering of lower ground floor, structural alterations to the existing masonry, strip out of modern partitions and services, introduction of new partitions and services. Installation of internal lift to all floors and new platform lift to front lightwell and associated fabric alterations. To the front elevation, works include: localised repairs, remodelling of front entrance, introduction of an additional step, adaptation of railings, introduction of first floor balcony, removal of existing windows and dropping of cills and introduction of new windows, installation of secondary glazing to the upper floors. Works include replacement of modern extensions with a new part 2 storey, part 5 storey rear extension and reinstatement of external courtyard, replacement of third floor windows with new timber sashes, removal and replacement of existing external pipework, localised masonry repairs. At roof level alterations to the existing roof structure to accommodate a lift overrun, smoke vent, plant and 5 new roof lights (Revised description).
Peckham Rye Railway Station Station Way And 1-4 Holly Grove London Southwark SE15 4RX
Listed Building Consent for partial demolition and alteration of Peckham Rye Station and formation of a new triple height concourse to the rear to provide additional circulation space, stairs and lifts and 3 storey extension onto Holly Grove provide lifts and stairs, an electrical substation and station support accommodation. Provision of an additional stair and lift on platform 1. Remodelling of the booking hall to improve station facilities and accessibility, including the creation of a new structural opening through to the new concourse building. Reinstatement of loss plasterwork and joinery in th booking hall. Reinstatement of cast iron and glazed canopy to the east elevation. Reopening of blocked up openings south elevation (booking hall) west elevation (waiting room) and installation of new timber windows, doors and associated joinery.
15 Gladstone Street London Southwark SE1 6EY
Refurbishment and extension of the property. To include rear extensions at first and second floor, internal alterations at each level and an adjustment to the mansard roof and 3no. dormer windows to the front of the property and 3no. rooflights. Remodelling of the interior on all floors.
Flat 2 Peacock House 38 St Giles Road London Southwark SE5 7RG
Removal of modern partitions and doors and remodelling of existing layout and installation of new partitions and doors to create an additional shower room, utility and access to the kitchen/ living area. Fixing shut of an existing door into the garden and installation of plasterboard and insulation behind the door. Removal of a modern window, with the fanlight retained. The enlargement of existing window opening to create a doorway and installation of French timber doors onto the garden.
14 Gladstone Street London Southwark SE1 6EY
Demolition of modern external brick rear lightwell stairs and replacement with a metal Building Regulation compliant stairs in the same location. Works to Lower Ground Floor level including: replacement of existing metal window with a single glazed timber window (front elevation) and garden patio doors with new timber French doors (rear elevation) remodelling of the internal walls, replacement of modern floor and ceiling finishes and tanking of front pavement vaults.
48 Willowbrook Road London Southwark SE15 6BW
Listed Building Consent for internal and external works to convert the former community centre into a residential dwelling. Works include refurbishment, remodelling and repair of the house and outbuildings at lower ground floor level. Upward extension to the rear extension at ground floor level. Creation of an opening and w new window to match existing fenestartion. Repairs to boundary treatments. New timber fencing to boundary walls and new cast iron railings to facade facing the driveway.