160 Blackfriars Road London Southwark SE1
Minor material amendments by variation of Condition 1 'Approved Plans' and Condition 30 'Number of Hotel Bedrooms' of planning permission ref. 20/AP/0556 (Erection of an eight storey building with basement, comprising a hotel (Class C1), flexible commercial or community unit (Class B1/D1), retail floorspace (Class A1/A3), creation of public space, landscaping and associated works. Works to the existing office building at ground and roof levels (including a new rooftop terrace, balustrades and PV panels); elevational alterations; and alterations associated with the creation of a new entrance on the Blackfriars Road elevation).
Honor Oak Pumping Station Hichisson Road London Southwark SE15 3AN
Details of Condition 5- Plans of security doors as required by planning permission 22/AP/4197 dated 06/02/2023 for Listed building consent for roof, rooflight, gutter, flashing, masonry and window repairs, replacement of broken glazing panes and installation of security mesh covers to windows, installation of security doors, internal repairs and new internal lighting.
Red Lion Court 46 - 48 Park Street London Southwark SE1 9EQ
Details of Condition 11 'Pre-Construction Circular Economy Statement' as required by planning permission ref. 22/AP/1602: 'Demolition of the existing building above ground and part-basement and redevelopment of the site to provide an 11-storey stepped building with roof top plant, plus a two storey basement, providing office, retail, restaurant and wellness uses alongside external terraces, landscaping, public realm works, new plant equipment, internal loading bays, cycle parking spaces and other associated works.'
Land To The Rear Of 99 Crystal Palace Road London SE22 9ES
Non-material amendment to planning permission 13-AP-2367 for 'Erection of a three bedroom house over 3 floors (basement, ground and first)' to allow for: Insert roof light over the light well in the single storey rear extension to the rear of the property.
Camberwell College Of Arts 37-39 Peckham Road London SE5 8UH
Installation of roof top plant and acoustic screens to the rear academic extension building
Elephant And Castle Shopping Centre, 26, 28, 30 And 32 New Kent Road And Arches 6 And 7 Elephant Road And London College Of Communications Site, Elephant And Castle London SE1 6TE
Details of Condition 25 (Green roof) pursuant to planning permission ref. 21/AP/1104 dated 29/07/2021 for 'Minor material amendments to planning permission 20/AP/3675 (for Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys above multi-level and single basements, to provide a range of uses including residential (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station, means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures.'
6 Canning Cross London Southwark SE5 8BH
Details of condition 9 (additional plans) pursuant to planning application reference. no. 20/AP/1931: Construction of a two-storey rear extension at ground and first floor levels and a mansard roof extension.
61 Calton Avenue London Southwark SE21 7DF
Non material amendment of planning permission ref. no. 23/AP/1984 dated 28/09/2023 for 'Raising of the existing outrigger roof by approx. 1050mm, to provide additional floorspace on the Second Floor. A new sash window matching the existing windows will replace the small existing window of the outrigger and two rooflights are added to the outrigger roof. The existing dormer on the rear elevation is proposed to be widened by approx. 700mm with two new sash windows to match the existing. The new dormer roof will be finished with roof tiles that will match the existing. The proposed works also include a new conservatory infill extension to the Ground Floor and the Crittall -type glazed conservatory extension will have a matching glazed roof to provide further sunlight into the Ground Floor space. The existing rooflight and double doors to the side of the proposed conservatory will be replaced with a Crittalltype rooflight and double doors, respectively, to match the proposed conservatory'. The amendment seeks the following: - The height of the raised roof ridge of the rear outrigger to be reduced to 0.85m above the existing - The new sash window to the rear of the two-storey outrigger to be reduced in proportion - The two new rear rooflights are to be conservation-type rooflights with a dividing vertical glazing bar - The height of the rear dormer is to be reduced to 2.6m from base to the ridge - The zinc cladding of the dormer is to be dark grey.
Riverside Primary School Janeway Street London Southwark SE16 4PS
Details of Condition 7- Details of the biodiversity (green/brown) roof as required by planning permission 21/AP/4729 dated 17/04/2023 for demolition of existing teaching block, caretakers house, playground canopies and dividing walls; construction of a new single storey extension and part refurbishment of the existing main school building; construction of a new single storey classroom block and kitchen dining block; and associated soft and hard landscaping improvement works.
150 - 154 Borough High Street London Southwark SE1
Details of Condition 8 'Archaeological Public Engagement' pursuant to planning permission 21/AP/0960: Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.