Units 1 And 4 Canada Water Retail Park London Southwark SE16
Approval of Reserved Matters (access, appearance, landscaping, layout and scale) pursuant to outline planning permission 21/AP/2655 for the comprehensive commercial development of the Canada Water Dockside Masterplan site. Reserved Matters Approval sought for construction of Building A2 (maximum height 55.2m AOD) comprising the following uses; offices (Class E), retail (E) and food and beverage (E), with cycle parking, landscaping, loading bay, plant and associated works. This is as an application for subsequent consent accompanied by an Environmental Statement. Consequently the application is accompanied by a Statement of Conformity submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) regulations 2017. This ES Statement of Conformity should be read in conjunction with the Canada Water Dockside Masterplan ES which can be viewed in full on the Councils website (21/AP/2655).
Units 1 And 4 Canada Water Retail Park London Southwark SE16
Approval of Reserved Matters (access, layout and scale) pursuant to outline planning permission 21/AP/2655 for the comprehensive commercial development of the Canada Water Dockside Masterplan site. Reserved Matters Approval sought for construction of a basement spanning Plots A1 and A2 comprising cycle parking, plant space and ancillary floorspace and associated works (all ancillary Class E) to support office and retail/food and beverage uses in Plots A1 and A2. This is as an application for subsequent consent accompanied by an environmental statement. Consequently the application is accompanied by a Statement of Conformity submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) regulations 2017. This ES Statement of Conformity should be read in conjunction with the Canada Water Dockside Masterplan ES which can be viewed in full on the Councils website (21/AP/2655).
Units 1 And 4 Canada Water Retail Park London Southwark SE16
Approval of Reserved Matters (access, appearance, landscaping, layout and scale) pursuant to outline planning permission 21/AP/2655 for the comprehensive commercial development of the Canada Water Dockside Masterplan site. Reserved Matters Approval sought for construction of Building A1 (maximum height 110m AOD) comprising the following uses; offices (Class E), retail (E) and food and beverage (E), with landscaping, plant and associated works. This is an application for subsequent consent accompanied by an Environmental Statement. Consequently the application is accompanied by a Statement of Conformity submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) regulations 2017. This ES Statement of Conformity should be read in conjunction with the Canada Water Dockside Masterplan ES which can be viewed in full on the Councils website (21/AP/2655).
Printworks Place And New Brunswick Street Canada Water Masterplan: Land Bound By Lower Road (West), Redriff Road (South), Quebec Way (East), Surrey Quays Road And Canada Water London
Reserved Matters approval is sought for the construction of a part single, part two-way carriageway along New Brunswick Street to serve the Canada Water Masterplan, public realm and landscaping to New Brunswick Street and Printworks Place and enabling works associated with the basement below Development Zone G (details of which will come forward as a separate Reserved Matters application).
Canada Water Sites C And E Surrey Quays Road London SE16 2XU
Approval of Reserved Matters pursuant to Condition 1(c) of the Outline Planning Permission 17/AP/3694 (details of linked basement; internal layouts of buildings; and landscaping) for 'Buildings C2, C3 and C4' (known as Phase 3 and 4). The proposals comprise the construction of three building ranging between 8 and 40 storeys comprising 565 units, 3,459sqm (gea) flexible retail (A1-A4) and 698sqm (GEA) cinema (D1) use, landscaping and new public realm, and 9,248sqm ancillary floorspace including wheelchair accessible parking, cycle storage, servicing and plant areas.
Canada Water Sites C And E Surrey Quays Road London SE16 2XU
Approval of Reserved Matters pursuant to Condition 1 (b) of Outline Planning Permission 17/AP/3694 for Building E1 (known as phase 2) including means of access; layout; scale; appearance; and landscaping . The proposals comprise the construction of four buildings ranging from 31.375m (AOD) up to 37.375m in height (AOD) comprising up to 21,417.18sqm (GEA) residential floorspace; 223 residential units; 332.99sqm (GEA) health care (Class D1); approximately 483.68 sqm (GEA) of flexible retail space (Class A1-A3); landscaping; new public realm; and basement comprising ancillary wheelchair accessible parking, cycle storage and plant areas. The application is accompanied by an Environmental Statement Addendum submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. The ES Addendum is available for viewing by the public online via Planning Register at: www.planning.southwark.gov.uk Printed copies of this ES Addendum are available on request for a charge. Requests to purchase a paper or DVD copy of the ES should be made to: AECOM St. George's House, 3rd Floor 5 St George's Road Wimbledon London SW19 4DR
Reel Street Canada Water Masterplan London SE16 7LL
Details of all reserved matters (Access, Appearance, Landscaping, Layout and Scale) pursuant to hybrid planning permission ref. 18/AP/1604 dated 29th May 2020 for comprehensive mixed use development of the Canada Water Masterplan site. Reserved Matters approval sought for the construction of an internal servicing street to serve Zones H and L of the Canada Water Masterplan, including associated public realm, car parking, service-bay and landscaping.
Zone L, Canada Water Masterplan Surrey Quays Road London Southwark SE16 7LL
Details of all reserved matters (Access, Appearance, Landscaping, Layout and Scale) relating to Development Zone L of the Canada Water Masterplan, comprising the construction of three residential buildings with flexible retail/workspace/community uses (Classes A1-A4, B1 and D1) at ground floor level alongside car parking, cycle parking, landscaping, public realm, plant and associated works. This application is pursuant to hybrid planning permission for the Canada Water Masterplan ref. 18/AP/1604 dated 29th May 2020, which was accompanied by an Environmental Statement. Consequently the application is accompanied by a Statement of Conformity submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) regulations 2017. This ES Statement of Conformity should be read in conjunction with the Canada Water Masterplan ES which can be viewed in full on the Council's website (18/AP/1604).
Printworks Street, The Canada Water Masterplan, Land Forming The Southwestern Part Of Printworks, Surrey Quays Road
Details of all reserved matters (Access, Appearance, Landscaping, Layout and Scale) pursuant to hybrid planning permission ref. 18/AP/1604 dated 29th May 2020 for comprehensive mixed use development of the Canada Water Masterplan site. Reserved Matters approval sought for the construction of a single carriageway along Printworks Street to serve the Canada Water Masterplan and neighbouring developments and associated public realm and landscape improvements.
The Dock And Land Adj To Zone D Canada Water Masterplan Site London SE16 7LL
Application for the approval of reserved matters (Access, Appearance, Landscaping, Layout and Scale) in relation to Canada Dock and land adjacent to zone D pursuant to hybrid planning permission ref. 18/AP/1604 dated 29th May 2020, relating to the re-development of Canada Dock, including the re-grading and re-planting of the SINC, construction of a new boardwalk, construction of steps and accessible slopes along the southern edge and associated public realm, informal play space and landscape improvements. This is an application for subsequent consent accompanied by an Environmental Statement. Consequently the application is accompanied by a Statement of Conformity submitted pursuant to the Town and Country Planning (Environmental Impact Assessment) regulations 2017. This ES Statement of Conformity should be read in conjunction with the Canada Water Masterplan ES which can be viewed in full on the Councils website (18/AP/1604).