160 Blackfriars Road London Southwark SE1
Minor material amendments by variation of Condition 1 'Approved Plans' and Condition 30 'Number of Hotel Bedrooms' of planning permission ref. 20/AP/0556 (Erection of an eight storey building with basement, comprising a hotel (Class C1), flexible commercial or community unit (Class B1/D1), retail floorspace (Class A1/A3), creation of public space, landscaping and associated works. Works to the existing office building at ground and roof levels (including a new rooftop terrace, balustrades and PV panels); elevational alterations; and alterations associated with the creation of a new entrance on the Blackfriars Road elevation).
Honor Oak Pumping Station Hichisson Road London Southwark SE15 3AN
Details of Condition 5- Plans of security doors as required by planning permission 22/AP/4197 dated 06/02/2023 for Listed building consent for roof, rooflight, gutter, flashing, masonry and window repairs, replacement of broken glazing panes and installation of security mesh covers to windows, installation of security doors, internal repairs and new internal lighting.
Red Lion Court 46 - 48 Park Street London Southwark SE1 9EQ
Details of Condition 11 'Pre-Construction Circular Economy Statement' as required by planning permission ref. 22/AP/1602: 'Demolition of the existing building above ground and part-basement and redevelopment of the site to provide an 11-storey stepped building with roof top plant, plus a two storey basement, providing office, retail, restaurant and wellness uses alongside external terraces, landscaping, public realm works, new plant equipment, internal loading bays, cycle parking spaces and other associated works.'
Elephant And Castle Shopping Centre, 26, 28, 30 And 32 New Kent Road And Arches 6 And 7 Elephant Road And London College Of Communications Site, Elephant And Castle London SE1 6TE
Details of Condition 25 (Green roof) pursuant to planning permission ref. 21/AP/1104 dated 29/07/2021 for 'Minor material amendments to planning permission 20/AP/3675 (for Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys above multi-level and single basements, to provide a range of uses including residential (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station, means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures.'
Riverside Primary School Janeway Street London Southwark SE16 4PS
Details of Condition 7- Details of the biodiversity (green/brown) roof as required by planning permission 21/AP/4729 dated 17/04/2023 for demolition of existing teaching block, caretakers house, playground canopies and dividing walls; construction of a new single storey extension and part refurbishment of the existing main school building; construction of a new single storey classroom block and kitchen dining block; and associated soft and hard landscaping improvement works.
150 - 154 Borough High Street London Southwark SE1
Details of Condition 8 'Archaeological Public Engagement' pursuant to planning permission 21/AP/0960: Minor material amendment to planning permission 19/AP/1173 (Construction of a seven storey extension to the rear (from ground to sixth floor- the ground floor being an under croft) and two additional storeys with terraces to the existing five storey building for the retention of A1 (retail) on the ground floor and increased B1 (office) floorspace on the upper floors to create a seven storey building across the footprint of the whole site.) Changes include: - Construction of a single storey extension at ground floor level to the rear; - New wall at ground floor level to the west and north elevation; - Raised cil level at 6th floor; - Fenestration changes, including additional windows to the east elevation at ground floor level; - Changes to the tower design, removal of glazed corner cube; - Revised plant configuration at roof level; - New staircore, lift overrun and smoke extract at roof level; - Areas at roof reserved for photovoltaics and green roof; - Creation of a new basement level to accommodate a new sprinkler tank/plant.
56 Peckham High Street London Southwark SE15 5DP
Upward rear extension at first floor providing a part enclosed roof terrace with the following hours of operation: Wednesday to Sunday 10:00 to 00:00 (next day); and installation of a mural (public art) on the west elevation.
29 -31 Choumert Grove London Southwark SE15 4RB
Demolition of existing pitched roof and construction of a mansard roof extension across both properties (29-31 Choumert Grove) with four dormer windows to the front elevation and two to the rear elevation to provide additional living accommodation, together with raising the existing parapet wall to the rear elevation and replacing all of the existing windows with aluminium framed casement windows.
6 Canning Cross London Southwark SE5 8BH
Details of condition 4 (arboricultural survey) pursuant to planning application reference. no. 20/AP/1931: Construction of a two-storey rear extension at ground and first floor levels and a mansard roof extension.
Former Bellenden Primary School Reedham Street London Southwark SE15 4PF
Details of Condition 5 (Bird Nesting Boxes) pursuant to planning permission 22/AP/4161 granted on 03/04/2023 for: (Minor material amendment to planning permission 18/AP/1788 dated 29/08/2018 for 'Demolition of the existing school buildings and redevelopment of the site involving the erection of a new part-single, part-two storey SEN Primary School (special education needs) with associated MUGA, landscaping, mini-bus parking and vehicle drop off area with access from Costa Street and exit onto Reedham Street' for the following changes: - Amendment of Condition 1 (Approved Plans) to remove community changing facilities and access to MUGA, alter the footprint, layout, design and materials of the development, introduce roof terraces (increasing pupil numbers from 48 to 56) - Measures support Southwark's policy - to achieve net zero carbon - Removal of Condition 8 (Biodiversity roof), Condition 12 (Community Use Scheme) and Condition 13 (Obscure Glazing) - Amendment of Condition 14 (Roof Use) as terraces are proposed).