Unit 4 St Saviours Wharf 23 Mill Street London Southwark SE1 2BE
Change of use from Class E to residential (Class C3) to form 2 x 1 bedroom units together with internal alterations.
38-40 Trinity Street London Southwark SE1 4JG
Refurbishment of the vacant basement accommodation, including repair and replacement of fabric, damp proofing, installation of sound and fire protection, new mechanical and electrical services and installation of external drop down stairs to the front elevation, facilitate the conversion into a one bedroom self contained residential unit.
Flat 3 187 Bermondsey Street London Southwark SE1 3UW
Replacement of existing roof access hatch with new opening glazed skylight and construction of a staircase to existing roof terrace and associated internal alterations; replacement of existing railings at roof level with new Building Regulation compliant railings works required to create a roof top amenity space; replacement of existing windows (3no. fourth floor and 1 no. third floor) with double glazed windows, refurbishment of front dormer window with introduction of new double glazed windows, sub-division of Third Floor bathroom to create a second bathroom and replacement of modern internal doors to residential apartment.