161-165 Borough High Street London SE1 1HR
Partial discharge of details of cycle storage (for Hotel only) as required by Condition 11 of the planning permission 13-AP-2007 for: Change of use of offices on upper floors of 161 Borough High Street to hotel (Use Class C1), erection of 3-storey rear extension above existing ground floor extension and rebuild existing top floor mansard, all to provide additional hotel space. Extension above rear wing of No. 163 to provide additional hotel space and rebuild and extend existing 5th floor mansard. Extension to office wing at rear of 163 Borough High Street/Mermaid Court by removing existing 2nd floor mansards and creating new 2nd and 3rd floor to provide additional office space (Use Class B1); change of use of basement from hotel and office to hotel use only. Erection of 4th floor mansard above 165 Borough HIgh Street and erection of 2nd floor infill behind the Borough High Street frontage to create additional hotel space. Erection of additional storey at 71 Newcomen Street to create a self-contained flat and change of use of first floor from office to self-contained flat (Use Class C3).
Beckett House 60 - 68 St Thomas Street London Southwark SE1 3QU
Discharge of obligation Schedule 5 Paragraph 1.1 'Public Realm Specification' and 5.1 'Landscaping Strategy' as required by Section 106 agreement associated with planning permission 20/AP/0944: 'Redevelopment of the site to include demolition of Becket House and the erection of a 27 storey building with additional level of plant and basement levels in order to provide office use (Class B1), retail (flexible Class A1/A3), cycle parking, servicing, refuse and plant areas, public realm improvements and other associated works incidental to the development.'
11-13 Spa Road London Southwark SE16 3RB
Details for discharge Condition 3c- Verification Report as required by planning permission ref. 17/AP/3281 dated 25/06/2020 (for demolition of existing buildings and construction of a part 4, 5 and 6 storey building to form student housing (sui generis), communal student facilities, plant room, cycle storage, gym, recycling and refuse facilities and associated works).
46-48 Grange Walk London Southwark SE1 3DY
Discharge of S106 Obligation: 'Highway Works' set out in Schedule 3, Part 1.1 of the Section 106 agreement ref. LEG/RP/RR020/164 associated with planning permission ref. 20/AP/0489
Development Land Between 59 And 61 Rye Hill Park London Southwark
Discharge of Schedule 8, paragraph 1.1 'Site Wide Energy Strategy' of the section 106 agreement associated with planning permission ref. 19/AP/0480 for 'Redevelopment of vacant site to provide enhanced public open space and the construction of a 6 storey building to provide up to 10 affordable dwellings (4 x social rent, 6 x shared ownership).' '
Beckett House 60 - 68 St Thomas Street London Southwark SE1 3QU
Discharge of Schedule 8 paragraph 3.1 'Be Seen Energy performance indicators' of the section 106 agreement attached to planning permission ref. 20/AP/0944: 'Redevelopment of the site to include demolition of Becket House and the erection of a 27 storey building with additional level of plant and basement levels in order to provide office use (Class B1), retail (flexible Class A1/A3), cycle parking, servicing, refuse and plant areas, public realm improvements and other associated works incidental to the development.' Agreement ref LEG/RP/PL/S106/RR020/202 LBS reg. 20/AP/0944.
49 Surrey Row London Southwark SE1 0BY
Discharge of 106 obligation - Proposed changes to the planning obligations Paragraph 3, schedule 2 of the Section 106 agreement requires submit for approval our DEMP/CEMP for planning permission 20/AP/0570 Construction of a building arranged over basement, ground, first - fourth and part fifth floors to provide Class B1 (office) space at basement and part ground floor, and 8 Class C3 (residential) units over part ground and first - fifth floors and associated works
301-303 Ilderton Road London SE15 1NW
Discharge of Schedule 9, Clause 1.1 'Demolition Environmental Management Plan' of the Section 106 Agreement attached to planning permission ref: 18/AP/2761, for: "Demolition of existing buildings and construction of a 12 storey building (plus basement) comprising 46 residential dwellings (Class C3) and commercial floorspace (Class B1(c)), creation of a new vehicular access from Hornshay Street with landscaping (including a communal roof garden), cycle parking and associated ancillary development".
Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark
Partially Discharge (Relocation of the hoarding for kiosk construction) pursuant to Requirement CHAWF1 (CoCP Part B, Section 4), Schedule 3 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) for the works at Chambers Wharf Thames Tideway Tunnel worksite only
Tulip House 66-70 Borough High Street London SE1 1XF
Partial discharge of Condition 4 - structural engineers calculations/ drawings for the proposed opening in the party wall between Nos. 66 and 68 and the larger opening at the rear of No. 66 required by planning permission dated 09/05/2017 [LBS Ref: 17/AP/0750] for 'Internal and external alterations associated with the change of use of part ground and basement levels from office (use class B1a) to flexible A1/A2/A3/A4 use, and the erection of an in-fill mansard roof extension at fourth floor level and creation of an additional third floor at the rear of the site to provide additional office accommodation (use class B1a), internal alterations and a new shopfront. - RESUBMISSION'.