11-13 Spa Road London Southwark SE16 3RB
Details for discharge Condition 3c- Verification Report as required by planning permission ref. 17/AP/3281 dated 25/06/2020 (for demolition of existing buildings and construction of a part 4, 5 and 6 storey building to form student housing (sui generis), communal student facilities, plant room, cycle storage, gym, recycling and refuse facilities and associated works).
Development Land Between 59 And 61 Rye Hill Park London Southwark
Discharge of Schedule 8, paragraph 1.1 'Site Wide Energy Strategy' of the section 106 agreement associated with planning permission ref. 19/AP/0480 for 'Redevelopment of vacant site to provide enhanced public open space and the construction of a 6 storey building to provide up to 10 affordable dwellings (4 x social rent, 6 x shared ownership).' '
49 Surrey Row London Southwark SE1 0BY
Discharge of 106 obligation - Proposed changes to the planning obligations Paragraph 3, schedule 2 of the Section 106 agreement requires submit for approval our DEMP/CEMP for planning permission 20/AP/0570 Construction of a building arranged over basement, ground, first - fourth and part fifth floors to provide Class B1 (office) space at basement and part ground floor, and 8 Class C3 (residential) units over part ground and first - fifth floors and associated works
301-303 Ilderton Road London SE15 1NW
Discharge of Schedule 9, Clause 1.1 'Demolition Environmental Management Plan' of the Section 106 Agreement attached to planning permission ref: 18/AP/2761, for: "Demolition of existing buildings and construction of a 12 storey building (plus basement) comprising 46 residential dwellings (Class C3) and commercial floorspace (Class B1(c)), creation of a new vehicular access from Hornshay Street with landscaping (including a communal roof garden), cycle parking and associated ancillary development".
Thames Tideway Tunnel At Chambers Wharf Chambers Street London Southwark
Partially Discharge (Relocation of the hoarding for kiosk construction) pursuant to Requirement CHAWF1 (CoCP Part B, Section 4), Schedule 3 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (as amended) for the works at Chambers Wharf Thames Tideway Tunnel worksite only
Beckett House 60-68 St Thomas Street London Southwark SE1 3QU
Discharge of obligation Schedule 7.1 Construction Enviormnment Management Plan (CEMP) as required by LBS S106 No 20/AP/0944 'Redevelopment of the site to include demolition of Becket House and the erection of a 27 storey building with additional level of plant and basement levels in order to provide office use (Class B1), retail (flexible Class A1/A3), cycle parking, servicing, refuse and plant areas, public realm improvements and other associated works incidental to the development'.
91-95 Tower Bridge Road London Southwark SE1 4TW
Part Discharge Details of condition 5 (materials) pursuant to planning permission 21/AP/1122 (Demolition of the existing buildings and construction of a new part four, part three and part two storey building facing Alice Street, a three storey terrace with mansard level and re-use of existing basement facing onto Tower Bridge Road, to provide 9no. residential dwellings (Use Class C3) and a retail unit (Use Class E(a)))
135 Park Street And 4-8 Emerson Street London SE1 9EA
Discharge of Schedule 4, Clause 1.2 'Delivery and Service Monitoring Plan' of the Section 106 Agreement attached to planning permission 19/AP/0240 [dated 27.08.2020] for: "Redevelopment of the site including the demolition of the existing buildings and construction of a 12 storey building (plus basement and roof top plant enclosure) with a maximum height of 50.707m AOD, comprising office (Class B1) floorspace on all floors with a flexible retail/café (Class A1/A3) unit at ground floor level. The development will include cycle parking, servicing, refuse and plant areas, hard- and soft-landscaped public realm improvements and other associated works".
Redundant Maintainance Yard Land To The Rear Of 58-62 Portland St London SE17 2PB
Discharge of Condition 3 (Site Investigation and Risk Assessment) pursuant to 18/AP/1137 [Demolition of redundant workshop and construction of three new houses land rear 58-62 Portland Street].
The London Power Tunnels II - Circuit 2 - New Cross To Hurst Southwark
Discharge of S106 Agreement relating to planning applications 18/AP/0463 and 18/AP/0464: 3 (1.6) Construction Industry and Training Report