Breakspeare 94 College Road London Southwark SE21 7NB
Tl. Whitebeam. Side of garages opposite No 1. To abate hazard & nuisance. Crown lift by up to 3m above garage access road and 1 2m clearance above garage roof. Remove small diameter deadwood Gl. Sycamore saplings adjacent near to the gable To abate hazard end of no.3. Lateral reduction to provide a 2.3m clearance from the roof. T2. Silver Birch side of no 1. To abate hazard. Remove small diameter deadwood. T4. Whitebeam rear of no 1 To abate hazard.Remove deadwood. TS. Silver Birch adjacent to College Road. To abate hazard. Remove deadwood. T6. Oak side of car park College Road. To abate hazard. Remove small diameter deadwood. T7. Oak on footway to side of car park College Road. To abate hazard Remove small diameter deadwood. T23. Birch rear of nos 4 and 6 To abate hazard Crown reduce 3m. T24. Horse Chestnut between residential blocks To abate hazard Remove deadwood. T25. Horse Chestnut between residential blocks. To abate hazard Remove deadwood.
Goschen Estate Bethwin Road London Southwark
Details of Condition 13 - Tree Planting, as required by planning permission 17/AP/1333 (Construction of a 5-storey block adjoining Causton House and a 4-storey block located adjacent to Harford House to provide 6 x 1 bed, 6 x 2 bed and 5 x 3 bed residential units (17 units) together with associated landscaping)
Lavington House 25 Lavington Street London SE1 0NA
Demolition of existing buildings and redevelopment of the site to provide a 10 storey (plus basement) commercial building with two flexible A1/A3/B1 units at ground/basement level and B1 floorspace on all upper levels and accessible parking/vehicular access and servicing from Ewer Street; 170 apartments in three residential buildings at 8,13 and 21 storeys (plus basement, including roof plant) with a flexible A1/A3/B1 unit at basement/ground floor level; parking/vehicular access from Lavington Street; 3 mews houses (3 storeys); new public realm; hard and soft landscaping; pedestrian routes; alterations to the public highways including widened footways, relocated parking and service bays, tree planting, resurfacing and associated works.