Roots In The Sky (Site Of The Former Blackfriars Crown Court) 1-15 Pocock Street London Southwark SE1 0BT
Discharge of Schedule 4, Part 1, Clause 1.1 'Affordable Workspace Plans' of the Section 106 Agreement attached to planning permission 22/AP/1347, which itself is an amendment of planning permission 20/AP/1537, for: "Development of site, involving part demolition, alterations and extensions to the existing building and basement, including the change of use from Class D1 to Class B1, to provide a seven-storey building with rooftop pavilions comprising: office floorspace (Class B1); retail spaces (Class A1); a cafe (Class A3); a restaurant (B1/A3); a bar (Class A4/B1); leisure uses including a publicly accessible roof terrace (Class D2); other external amenity spaces and landscaping; a new entrance on Loman Street and route through the building; plant, and; other associated works".
Site Of The Former Blackfriars Crown Court 1-15 Pocock Street London SE1 0BT
Variation of Section 106 Agreement dated 06.05.2021 pursuant to permission 20/AP/1537 to capture the changes introduced by minor material amendment 22/AP/1347. The development description for 22/AP/1347 is: "Minor material amendments to planning permission 20/AP/1537 [approval date: 06.05.2021] for the development of the site including partial demolition, extensions and alterations to provide a commercial building with community uses. The amendments comprise: - basement and structural alterations including deepened and extended basement and revised piling approach; - cross laminated timber floor construction changed to concrete plank system; - addition of external structural columns on Sawyer Street facade; - internal reconfiguration including consolidation of cores, relocated refuse store, revised cycle parking and end of journey facilities, revised affordable workspace and community auditorium design; - fire strategy updates; - external alterations to doors and repositioning of south-east external stair; - relocation of visitor cycle parking; - rooftop amendments including revised swimming pool and atrium, revised roof plant enclosures, revised Community Pavilion layout, provision of additional office space; and - the addition of 37 more trees".
81 Picton Street London Southwark SE5 7QH
Non-material amendment of planning permission 21/AP/1535 'Minor material amendment to planning permission 19/AP/5860 (Variation to Condition 1 (Approved Plans) pursuant to planning permission 18/AP/3350 'Redevelopment of the site to include the demolition of the existing building and erection of a part four, part five storey new care home to provide 92 bed spaces with associated landscaping and access works'.) for internal alterations to provide additional communal space resulting in the reduction in the number of bed spaces from 102 to 98, reduction in the number of car parking spaces from 12 to 11 and the addition of a roof plant.' To amend Condition 6 to allow the BREEAM Post Construction Review to be submitted within 6 months of completion of the development rather than before the first occupation of the building.
London South Bank University 103 Borough Road London Southwark SE1 0AA
Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter; - the construction of a five-storey 'meanwhile' pavilion building as part of Phase 1, which if/when Phase 2 is brought forward would be partly demolished and partly incorporated into the consented 'Learning Centre' component of the overall scheme; and - the provision of an external staircase, a temporary storage compound and hard surfacing in connection with the 'meanwhile' pavilion building, all of which would be removed if/when Phase 2 is brought forward.
Imperial War Museum Annex Austral Street London Southwark SE11 4SJ
Non-material amendment to planning permission 20/AP/0779 [Approval date: 08.07.2020] for 'Refurbishment and extension of the All Saints Annexe, with all internal floorspace to be mixed Class B1/D1 (office/museum) use, involving the demolition of existing rear extensions and the construction of new two-storey rear extensions. The development would include hard and soft landscaping improvements, the provision of rooftop plant and the creation of an associated waste storage area' comprising: - Reduction in the number of rooflights on the hub roof; - Changes to the planting beds and hand rails around the perimeter of the two rear sunken terraces; - Provision of a new planting bed around the base of two proposed trees within the rear yard; - Enlargement of a consented planting bed around the base of two existing trees within the rear yard; - Changes to the layout of the chiller screening; - Addition of render to the 'plinth' on all elevations; - Addition of one air brick on the east (front) elevation; - Relocation of some air bricks on the west (rear) elevation; and - Alterations to the consented internal layout.
London South Bank University 103 Borough Road London Southwark SE1 0AA
Variation of section 106 Agreement dated 25.11.2019 pursuant to permission 17/AP/4233 to split all relevant obligations to reflect the two-phase phasing plan and other changes introduced by minor material amendment 20/AP/1333. The development description for 20/AP/1333 is: "Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter".
Aylesbury Plot 18 Within Land Bounded By Thurlow Street To The East Dawes Street To West Southwark
Non material amendment of planning permission 17AP3846 (Demolition of existing buildings and redevelopment to provide a mixed use development comprising a number of buildings ranging between 2 to 20 storeys in height (9.45m - 72.2m AOD), providing 830 residential dwellings (Class C3); flexible community use, early years facility (Class D1) or gym (Class D2); public and private open space; formation of new accesses and alterations to existing accesses; energy centre; gas pressure reduction station; associated car and cycle parking and associated works.) The amendments consist of: - Amendments to Energy Strategy (to provide ASHP and PV's instead of CHP) - Minor internal and external changes to the south block including relocated doors, lighting changes, parapet changes at roof level and access amendments at roof level including the provision of a hand rail - Minor elevational changes to the north block buildings including changes to the balconies and windows - to ensure they comply with building regulations.
Sampson House 64 Hopton Street SE1 9JH & Ludgate House 245 Blackfriars Road SE1 & Railway Arches.
Non material amendment to planning permission 18/AP/3696 dated 18th December 2019 for 'Minor material amendment to 18/AP/1702 which was an amendment to 17/AP/286 and 12/AP/3940 in order to make external and internal amendments to Ludgate C comprising: Amendments to the roof top plant which has been reoriented and consolidated which ensures that it is no longer visible in the key views from the east along Southwark Street and creates the opportunity for a brown roof over the plant area. The external alterations to the roof plant allow internal re-arrangements on the upper floors which provide additional office space (1,180sqm GIA) with the insertion of a new mezzanine level. Alterations to the facade including the size and orientation of the glass panels. Enhancements to the base of the building around the newly created public realm including the treatment of the columns and the soffit'. The amendment seeks the following: an amendment to the wording of Condition 12 in order to allow the condition to be discharged by building, rather than the development as a whole.