Open Land Rear Of 1-51 Peckham High Street Bounded By Sumner Avenue And Melon Road Open Land Adjacent To 59 Peckham High Street And Sumner House Located On Sumner Road London
Non-material amendment pursuant to 16/AP/4018 [Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4; The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c to provide 44 no flats and 4 no townhouses and partial demolition of boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); part 4(Block B); a part four, part 6 storey building to provide 72 no flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level together with car parking, hard and soft landscaping, and other associated works incidental to the development] for the construction of a fire safety maintainance enclosure.
123 Grove Park London Southwark SE5 8LD
Certificate of Lawfulness (existing) to verify implementation of works pursuant to 17/AP/4124 [Change of use from Class D1 with an ancillary Class B1 office function to Class C3 for residential use, including conversion and part demolition of existing main house to enable the creation of x5 new residential units and the construction of x4 new residential units in the rear garden with x9 off street parking spaces, associated communal and private landscaped areas].
Elephant And Castle Shopping Centre, 26, 28, 30 And 32 New Kent Road And Arches 6 And 7 Elephant Road And London College Of Communications Site, Elephant And Castle London SE1 6TE
Details of condition 19 parts ii) and iii) (Detailed construction drawings: East Site) E2 residential tower and E3 residential tower only as required by planning permission dated 29.07.2021 ref. 21/AP/1104 for: "Minor material amendments to planning permission 20/AP/3675 (for Phased, mixed-use redevelopment of the existing Elephant and Castle shopping centre and London College of Communication sites comprising the demolition of all existing buildings and structures and redevelopment to comprise buildings ranging in height from single storey to 35 storeys above multi-level and single basements, to provide a range of uses including residential (use class C3), retail (use Class A1-A4), office (Use Class B1), Education (use class D1), assembly and leisure (use class D2) and a new station entrance and station box for use as a London underground operational railway station, means of access, public realm and landscaping works, parking and cycle storage provision, plant and servicing areas, and a range of other associated and ancillary works and structures."
123 Grove Park London Southwark SE5 8LD
Non material amendment of planning permission ref. no. 17/AP/4124: Change of use from Class D1 with an ancillary Class B1 office function to Class C3 for residential use, including conversion and part demolition of existing main house to enable the creation of x5 new residential units and the construction of x4 new residential units in the rear garden with x9 off street parking spaces, associated communal and private landscaped areas. NMA sought: to enable the development to be undertaken in phases.
123 Grove Park London Southwark SE5 8LD
Non material amendment of planning permission ref. no. 17/AP/4124: Change of use from Class D1 with an ancillary Class B1 office function to Class C3 for residential use, including conversion and part demolition of existing main house to enable the creation of x5 new residential units and the construction of x4 new residential units in the rear garden with x9 off street parking spaces, associated communal and private landscaped areas. NMA sought: This non-material amendment seeks to vary Condition 2 to include for the 5no. demolition drawings.
Landmark Court Land Bounded By Southwark Street Redcross Way And Cross Bones Graveyard London SE1
Details of Condition 7 'Final Construction Environmental Management Plan', for Block 02(B) only, attached to planning permission 19/AP/0830 [approval date: 05.01.2021] for: "Mixed-use development involving the demolition of 25-33 Southwark Street, the restoration of 15 Southwark Street for residential use and the erection of new buildings comprising: a part 6/8/9-storey office (Class B1) building incorporating a single-storey basement, flexible ground floor uses (Classes A1/A2/A3/A4 and D2) and workspace units (Class B1); a 3-storey workshop building (Class B1); a marketplace with up to 9 permanent stalls (Class A1); 36 residential units in the refurbished 15 Southwark Street building and a new 8-storey block; associated areas of new public realm; hard and soft landscaping; enhancements to Crossbones Burial Ground; means of access and enclosure, and; ancillary plant and equipment".
Land At 19 21 And 23 Harper Road 325 Borough High Street And 1-5 And 7-11 Newington Causeway London SE1 6AW
Non-material amendment to planning permission ref. 18/AP/0657 (Demolition of existing buildings and redevelopment to provide construction of a part 5, part 7, part 8 and part 13 building a mixed-use development comprising 328 hotel rooms (Class C1) 20 no. residential dwellings (Class C3), offices, workspace and workshops (Class B1), multifunctional community events space (Class B1/D1), retail use (Class A1/A2/A3), 4 no. car parking spaces together with access, cycle parking, hard and soft landscaping and other associated works incidental to the development). The proposed amendments seek to introduce a phasing strategy, and to amend the wording of conditions 3, 5, 8 and 11 to reflect the phasing strategy
Wood Dene Site Bounded By Queens Road Meeting House Lane And Carlton Grove SE15
Details of Condition 19 part b 'Code for Sustainable Homes Final (Post Construction Certificates)' pursuant to planning permission ref. 14/AP/3029 (Variation of Condition 2 (approved plans) of planning permission 13/AP/0876 for: "Demolition of remaining structures and erection of three buildings between two and nine storeys in height to provide 333 residential units and 450sqm (GIA) of flexible retail (Classes A1-A3) / Office (Class B1) / Non-Residential Institution (Class D1) space together with the provision of access, car and cycle parking, plant, landscaping and an energy centre" to allow for amendments to the design of the facade and chimney of the energy centre in block C).
Plot H11A Within Land Bound By New Kent Road To The North Rodney Place To The East Plot H11B And Elephant Park To The South And Plot H5 To The Wes
Details of condition 2 (Ground floor plan) of reserved matters required by permission ref. 19/AP/2116 (Application for approval of reserved matters (appearance, layout and scale only) for Plot H11A within Elephant Park submitted pursuant to the Outline Planning Permission ref. 12/AP/1092. The proposal comprises the construction of three buildings ranging between 10 and 19 storeys in height (maximum height 66.8m AOD) comprising 222 residential units, 1,421.8 sqm (GEA) flexible retail, office, community and leisure (A1-A5/B1/D1/D2) uses, wheelchair accessible parking, cycle storage, servicing, plant areas, landscaping, new public realm, and other associated works, with a revised facade design, a revised ground floor layout, revised floorspace figures and a reduction in maximum height to those approved by reserved matters approval ref. 18/AP/1862 for Plot H11a) to propose changes to the agreed ground floor layout. Revised ground floor layout to that previously approved by ref. 20/AP/1543, so that retail unit R2 and the commercial unit can be combined.
27 Crosby Row London Southwark SE1 3YD
Alterations to roof including construction of new dormer windows to front and rear, repair and refurbishment of existing fenestration, erection of rear extension at first and second floor levels, refurbishment and alterations including removal of historically unsympathetic fabric to reinstate courtyard at rear. Part of ground floor level in use as office space to continue to be used as office as well as studio workspace with remainder of property being retained as single residential unit.