Open Land Rear Of 1-51 Peckham High Street Bounded By Sumner Avenue And Melon Road Open Land Adjacent To 59 Peckham High Street And Sumner House Located On Sumner Road London
Details of Condition 8 Cycle Storage - Block D - Design and Access Statement to include 1:50 details provided for the secure and covered storage of cycles. Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4: The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c) to provide 44 no flats and 4 no townhouses and partial demolition of a boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); a part four, part 6 storey building to provide 72 no. flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level, together with car parking, hard and soft landscaping, and other associated works incidental to the development.
Open Land Rear Of 1-51 Peckham High Street Bounded By Sumner Avenue And Melon Road Open Land Adjacent To 59 Peckham High Street And Sumner House Located On Sumner Road London SE15 SE15 5QS
Details of Condition 5 (Arboricultural Method Statement), as required by planning permission 16/AP/4018(Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4: The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c) to provide 44 no flats and 4 no townhouses and partial demolition of a boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); a part four, part 6 storey building to provide 72 no. flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level, together with car parking, hard and soft landscaping, and other associated works incidental to the development.)
Open Land Rear Of 1-51 Peckham High Street Bounded By Sumner Avenue And Melon Road Open Land Adjacent To 59 Peckham High Street And Sumner House Located On Sumner Road London SE15 Southwark SE15 5QS
Details of Condition 3 (Site investigation & geo-environmental assessment), as required by planning permission 16/AP/4018(Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4: The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c) to provide 44 no flats and 4 no townhouses and partial demolition of a boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); a part four, part 6 storey building to provide 72 no. flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level, together with car parking, hard and soft landscaping, and other associated works incidental to the development.)
London South Bank University 103 Borough Road London Southwark SE1 0AA
Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter; - the construction of a five-storey 'meanwhile' pavilion building as part of Phase 1, which if/when Phase 2 is brought forward would be partly demolished and partly incorporated into the consented 'Learning Centre' component of the overall scheme; and - the provision of an external staircase, a temporary storage compound and hard surfacing in connection with the 'meanwhile' pavilion building, all of which would be removed if/when Phase 2 is brought forward.
Open Land Rear Of 1-51 Peckham High Road Bounded By Sumner Avenue And Melon Road, Open Land Adjacent To 59 Peckham High St And Sumner House London Southwark
Non Material amendment for planning application 20AP0433 dated 28/10/2020 for minor material amendment to planning permission 16/AP/4018 [Approval date: 15.11.2019] 'Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4; The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c to provide 44 no flats and 4 no townhouses and partial demolition of boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); part 4(Block B); a part four, part 6 storey building to provide 72 no flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level together with car parking, hard and soft landscaping, and other associated works incidental to the development' consisting of: - One change to the design of Flaxyard Block B: - Switching the balcony/terrace balustrades from glass to solid panels; - Changes to the design of Flaxyard Block C, including: - Enlargement of building footprint on floors 04 to 05; - Small number of fenestration changes; - Reduction in size of the external cycle store, but with a separate supplementary store to now be provided; - Changes to the design of Flaxyard Block D, including: - Enlargement of building footprint on floors 01 to 03; - Reduction of floorspace of the commercial unit from 247m2 to 224.5m2; - External door changes; - Changes to landscaping and car parking arrangements. The amendment are for change of Energy Strategy from CHP to ASHPs with associated plant room and roof top plant Removal of 9 dwellings from M4(2b) classification in Condition 12
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of Condition 6 - scale 1:5, 1:10 or 1:20 section detailed-drawings of the elements required by planning permission dated 29/11/2018 [LBS Ref 18/AP/2840] 'Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts',
272 St Jamess Road London Southwark
Application under Section 74B of the Town and Country Planning Act 1990 to temporarily extend construction hours until 31 August 2021 for planning permission 18/AP/0156 (Demolition of existing building and erection of a student accommodation building of up to nine storeys (maximum height 30.815m AOD, 29.525m from ground), to comprise 250 student rooms and associated communal facilities, 73 sqm cafe/retail space (A1/A3 use class), hard and soft landscaping, 2 disabled parking spaces and cycle parking. REVISED DESCRIPTION) to permit works until 9pm Monday to Friday and up to 6pm on Saturdays
30 Southbank Central Stamford Street London Southwark SE1 9LS
Details of Condition 1 (Landscaping details), as required by planning permission 15/AP/2511 (Variation of condition 2 (approved plans) of planning permission 11/AP/3797 (granted on 13 March 2012) for the refurbishment and recladding of the tower and podium buildings, erection of six additional storeys to the tower for residential use and change of use of floors 11 to 30 of the tower from offices to residential, erection of a series of extensions and additions for office use and creation of retail space, pool and gym on the ground floor, and formation of a new pedestrian route linking Stamford Street to Upper Ground. The amendments consist of: i. alteration and enlargement of the Stamford Street offices ii. alteration and enlargement of the tower office entrance on Hatfields; iii. introduction of new internal accommodation stair to tower; iv. extension of retail units 4 (fronting Hatfields) and 7 (within new pedestrian route); v. subdivision of retail unit 5 (within new pedestrian route); vi. revised design and layout for the 7th floor Stamford Street office roof terrace.)
London South Bank University 103 Borough Road London Southwark SE1 0AA
Variation of section 106 Agreement dated 25.11.2019 pursuant to permission 17/AP/4233 to split all relevant obligations to reflect the two-phase phasing plan and other changes introduced by minor material amendment 20/AP/1333. The development description for 20/AP/1333 is: "Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter".
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of Condition 3 - External materials, as required by planning permission 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)