Tower Bridge Business Complex 100 Clements Road Aka Biscuit Factory & Bermondsey Campus Site Keetons Road London SE16 4DG
Non-material amendment to condition 2 (Approved plans and documents) of planning permission ref. 17/AP/4088 (Full planning permission for demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing new homes (Class C3), flexible Class A1/A3/A4/B1/D1/D2, flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, and a new secondary school. The development also includes communal amenity space, landscaping, children's play space, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works; and, Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed-use scheme, providing new homes (Class C3) and flexible multi-use floorspace (Class A1/A3/A4/D1/Sui Generis), and other associated works). Amendment of condition 2 to amend demolition drawings for Block F to allow further demolition of the facades due to asbestos and for the ground floor slab to be broken out.
Tower Bridge Business Complex 100 Clements Road Aka Biscuit Factory & Bermondsey Campus Site Keetons Road London SE16 4DG
Non-material amendment to amend the description of development of planning permission ref. 17/AP/4088 (as amended) dated 04/06/2020 (Full planning permission for demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing up to 1,418 residential units, flexible Class A1/A3/A4/B1/D1/D2 and flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, a new secondary school, in buildings ranging from 5 to 35 storeys in height as well as the creation of a single storey basement. The development also includes communal amenity space, landscaping, children's playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works; and, Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed-use scheme, providing up to 130 residential units and flexible multi-use floorspace (Class A1/A3/A4/D1/Sui Generis), and other associated works). The amendment consists of alterations to the description of development to remove reference to the number of residential units and building heights.
Tower Bridge Business Complex 100 Clements Road London Southwark SE16 4DG
Non material amendments to planning permission ref. 17/AP/4088: (Demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed use scheme providing up to 1,418 residential units, up to 3,436 sqm GEA of flexible Class A1/A3/A4 floorspace, up to 14,666 sqm GEA of flexible Class B1 floorspace, up to 869 sqm GEA of flexible Class D1/D2 and up to 3,311 sqm GEA of multi use floorspace (A1/A3/A4/D1) within Building BF-F, a new secondary school, in buildings ranging from 6 to 36 storeys in height as well as the creation of a single storey basement. The development also includes communal amenity space, landscaping, childrens' playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and other associated works; and Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed use scheme providing up to 130 residential units and up to 780 sqm GEA of flexible A1/A3/A4/D1/Sui Generis Uses and other associated works). The proposal is 1) to amend the wording of Condition 15 'Foundations piling and ground structures' to exclude advance works and 2) amend Condition 52 'Phasing Plan' with revised drawing.
Block J, The Biscuit Factory 100 Clements Road Southwark London SE16 4DG
Non material amendment of planning permission ref. no. 22/AP/3723: Variation of Conditions 1, 5 and 6 of planning permission ref. 17/AP/4283 (Part demolition of existing building and erection of a six storey extension with basement, comprising office floorspace (Use Class E(g)) and ancillary cafe; part replacement facade and minor elevational changes to existing building and other associated development including landscape/surfacing alterations). The proposed amendments include: changes to ground floor entrance to match ground floor openings on south elevation, fifth floor extension to commercial floor space and terrace, reduced height of brick parapet and replacement with balustrade on south elevation fifth floor and fifth floor mezzanine, re-location of biodiverse green roof and increased provision of green roof from 58sqm to 170sqm, revised layout of PV roof panels, revised roof light design, replacement of precast concrete lintels with metal lintels on north and south elevation, and revised design of external escape staircase design on west elevation. NMA sought: Non-material amendments for the removal of the existing Portico and rebuild a new Portico at a higher position to match the existing
Block J Tower Bridge Business Complex 100 Clements Road London SE16 4DG
Non-material amendment by planning permission ref. 17/AP/4283 dated 08/06/2018 (Part demolition of existing building and erection of a six storey extension with basement, comprising 4,344sqm of office floorspace (Use Class B1) and ancillary cafe; part replacement facade and minor elevational changes to existing building and other associated development including landscape/surfacing alterations). The amendment is to update the development description to omit reference to the amount of office floorspace and update the use class. The revised development description will read: "Part demolition of existing building and erection of a six storey extension with basement, comprising office floorspace (Use Class E(g)) and ancillary cafe; part replacement facade and minor elevational changes to existing building and other associated development including landscape/surfacing alterations."
2 Varcoe Road London Southwark SE16 3DG
Non material amendment required by planning permission 18/AP/2895 Demolition of existing buildings and erection of a new mixed use development comprising a part 7, part 9 storey (maximum height above ground of 29.99m) building of 288sqm commercial floor space (Use Class B1) and 74 residential dwellings (Use Class C3) with associated bin stores, cycle stores, plant rooms and hard and soft landscaping. This application represents a departure from strategic policy 10 'Jobs and Businesses' of the Core Strategy (2011) and Saved Policy 1.2 'Strategic and Local Preferred Industrial Locations' of the Southwark Plan (2007) by virtue of proposing to introduce residential accommodation in a preferred industrial location. 1. Increased height of lift overrun to North Core 2. Increased height of lift overrun to South Core 3. Create 1.8m high fence/guarding to perimeter of kids playground. 4.Alterations to 2nd floor enclosed balconies on west elevation (only) to be openable winter gardens to match original approved design. 5.Alterations to 3rd floor and above enclosed balconies on west elevation (only) to be open balconies with railing and balustrade to match original approved design.
Tower Bridge Business Complex 100 Clements Road Aka The Biscuit Factory & Bermondsey Campus Site Keetons Road London SE16 4DG
Non-material amendment to planning permission 17/AP/4088 (Full planning permission for demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing up to 1,418 residential units, flexible Class A1/A3/A4/B1/D1/D2 and flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, a new secondary school, in buildings ranging from 5 to 35 storeys in height as well as the creation of a single storey basement. The development also includes communal amenity space, landscaping, children's playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works; and, Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed use scheme, providing up to 130 residential units and flexible multi-use floorspace (Class A1/A3/A4/D1/Sui Generis), and other associated works) for internal and external alterations to buildings BF F and BF- OPQ and amendments to condition 2 (approved plans and documents) and 52 (phasing plan).
Fielden House 28-42 London Bridge Street London Southwark SE1 9SG
Non-Material Amendment to planning permission 20AP1473 dated 26/8/2020 for demolition of existing buildings and erection of part 26 and part 16 storeys to provide 176 apartments (141 use Class C3 and 35 flexible use C1/C3), with 1,800 sq m (gross) of flexible retail space (Classes A1, A2, A3 and A4), service area, one level of basement, 4 car parking spaces and associated hard and soft landscaping, amenity spaces and alterations to existing highways adjoining. Amendment relates to the proposed changes to the development description to reduce the specified retail quantum from 1,800sqm to 1,769sqm (gross)
81 Picton Street London Southwark SE5 7QH
Non-material amendment of planning permission 21/AP/1535 'Minor material amendment to planning permission 19/AP/5860 (Variation to Condition 1 (Approved Plans) pursuant to planning permission 18/AP/3350 'Redevelopment of the site to include the demolition of the existing building and erection of a part four, part five storey new care home to provide 92 bed spaces with associated landscaping and access works'.) for internal alterations to provide additional communal space resulting in the reduction in the number of bed spaces from 102 to 98, reduction in the number of car parking spaces from 12 to 11 and the addition of a roof plant.' To amend Condition 6 to allow the BREEAM Post Construction Review to be submitted within 6 months of completion of the development rather than before the first occupation of the building.
London South Bank University 103 Borough Road London Southwark SE1 0AA
Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter; - the construction of a five-storey 'meanwhile' pavilion building as part of Phase 1, which if/when Phase 2 is brought forward would be partly demolished and partly incorporated into the consented 'Learning Centre' component of the overall scheme; and - the provision of an external staircase, a temporary storage compound and hard surfacing in connection with the 'meanwhile' pavilion building, all of which would be removed if/when Phase 2 is brought forward.