81 Picton Street London Southwark SE5 7QH
Non-material amendment of planning permission 21/AP/1535 'Minor material amendment to planning permission 19/AP/5860 (Variation to Condition 1 (Approved Plans) pursuant to planning permission 18/AP/3350 'Redevelopment of the site to include the demolition of the existing building and erection of a part four, part five storey new care home to provide 92 bed spaces with associated landscaping and access works'.) for internal alterations to provide additional communal space resulting in the reduction in the number of bed spaces from 102 to 98, reduction in the number of car parking spaces from 12 to 11 and the addition of a roof plant.' To amend Condition 6 to allow the BREEAM Post Construction Review to be submitted within 6 months of completion of the development rather than before the first occupation of the building.
London South Bank University 103 Borough Road London Southwark SE1 0AA
Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter; - the construction of a five-storey 'meanwhile' pavilion building as part of Phase 1, which if/when Phase 2 is brought forward would be partly demolished and partly incorporated into the consented 'Learning Centre' component of the overall scheme; and - the provision of an external staircase, a temporary storage compound and hard surfacing in connection with the 'meanwhile' pavilion building, all of which would be removed if/when Phase 2 is brought forward.