75-76 Blackfriars Road London Southwark
Listed building consent for refurbishment and extension of ground floor and lower ground floor offices including partial demolition of existing structures. Refurbishment, extension and conversion of upper floors from residential to hotel use Change of use for part of building from residential to hotel. Alterations to railings on Blackfriars Road to provide wheelchair access.
75-76 Blackfriars Road London Southwark
Refurbishment and extension of ground floor and lower ground floor offices including partial demolition of existing structures. Refurbishment, extension and conversion of upper floors from residential to hotel use Change of use for part of building from residential to hotel. Alterations to railings on Blackfriars Road to provide wheelchair access.
91 - 93 Peckham High Street London Southwark SE15 5RS
Minor material amendment to planning permission 16/AP/3075 [Approval date: 29.03.2019] 'Redevelopment comprising the removal of the Peckham Arch and redevelopment and part conversion of the southern part of the square (including 91-93 Peckham High Street) to provide a mixed use scheme comprised of two buildings of 4 and 6 storeys to provide 19 residential (Class C3) units, 255 sqm of gallery (Class D1) space, 201 sqm of co-work (Class B1) space, and 82 sqm of office (Class B1)/retail(Class A1) space with ancillary covered cycle storage and enclosed refuse storage' consisting of: - Changes to the design of Site/Block 1, including: - Reduction in the floor area of the consented gallery and associated facilities; - Reconfiguration of the residential core at ground floor level to incorporate a refuse store off Peckham High Street; - Addition of rooftop plant; - Alterations to the south, west and north elevations (fenestration, materials, parapet levels, rainwater goods etc.); - Transfer of sedum roof from roof of Level 02 to roof of Level 03; - Changes to the design of Site/Block 2, including: - Reduction in floor area of the co-working space; - Enlargement of building footprint; - Increase to the building's height; - Creation of separate bin store for co-working space; - Addition of rooftop plant; - Alterations to the west and north elevations (fenestration, materials, parapet levels, rainwater goods etc.); - Changes to landscaping and refuse strategy.