Southwark Council Planning Applications

Found 2 planning applications

21/AP/1144 | Approval of Details

1 Bank End London Southwark SE1 9BU

Details of Condition 16- Landscaping as required by planning permission 19/AP/1649 dated 02/10/2019 for Variation of condition 2 (approved plans) of planning permission 15/AP/3066 for 'Redevelopment of 1 Bank End, including reuse of railway arches and rebuilding and extension of the rear of Thames House, Park Street (behind retained facade); remodelling of Wine Wharf building on Stoney Street and development of a two storey building at 16 Park Street, all to provide a development reaching a maximum height of 6 storeys (maximum building height 27.419m AOD) comprising retail units (flexible class A1 shops, A3 cafes/restaurants and A4 drinking establishments use) at ground and first floor levels, a gallery (Class D1 use) at ground floor level, office floorspace (Class B1 use) at ground up to fifth floor level, a cinema (Class D2 use) at ground floor and basement level, associated cycle parking spaces at basement, associated refuse and recycling with new public access routes and public open space' to make minor-material amendments including: Alterations to internal retail layouts dictated by an updated Fire Strategy, Alterations to the west elevation of Building 02, Alterations to the east elevation of Building 02 dictated by change of first floor use; and Alterations to elevations of Building 04.

Local Authority
Southwark Council
Type
Other (Approval of Details)
Decision
Approved (AOD - Granted)
Application Received
01/04/2021
Application Validated
06/04/2021
Extension Alteration Variation Development Landscaping Office Shop House Remodelling
20/AP/2601 | Variation/discharge of Legal Agreement

London South Bank University 103 Borough Road London Southwark SE1 0AA

Variation of section 106 Agreement dated 25.11.2019 pursuant to permission 17/AP/4233 to split all relevant obligations to reflect the two-phase phasing plan and other changes introduced by minor material amendment 20/AP/1333. The development description for 20/AP/1333 is: "Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter".

Local Authority
Southwark Council
Type
Other (Variation/discharge of Legal Agreement)
Decision
(Agreed - for App Types VLA & VNMC)
Application Received
08/09/2020
Application Validated
08/09/2020
Extension Alteration Erection Demolition Variation Amendment Roof Development Landscaping Shop