42 Braganza Street London Southwark
Non-material amendments for Internal alteration for planning application 17/AP/0964 dated 30/01/2018 for demolition of existing buildings and erection of 5 new blocks, ranging from 3 to 5 storeys in height comprising 33 new homes (5 x intermediate and 28 x private)(Use Class C3) and one new 3 storey block comprising 428sqm of workspace (Use Class B1) with associated landscaping, disabled car parking, cycle parking and public realm works.' The proposed non-material changes include amendments to the internal layout configurations, window and door designs, and refuse and cycle storage design and location, removal of roof rail guarding, and removal of office balcony.
161-179 Manor Place London SE17 3BS
Non material amendment to planning permission 21/AP/1277 dated 1st October 2021 for 'Variation of Condition 2 (Approved Plans) pursuant to planning permission 17/AP/0907 for Demolition of single storey office building and a derelict three-storey row of shops and flats above (with the retention of the original Victorian facade), and the construction of a six storey building (behind retained facade) comprising 56 flats (20 x social rented, 8 x intermediate and 28 x private) above a health centre/office space (745sqm)(Use Class D1/B1), pharmacy/shop (85sqm)(Use Class A1) and cafe (285sqm)(Use Class A3), with associated landscaping and public realm works. The amendment seeks the following: to take down the existing terrace facade and rebuild and replicate the Victorian façade on the front of the new building and amendments to the approved window designs for the window fenestrations in order to provide opening windows to habitable rooms.' - The proposed non-material changes include internal alterations to provide open plan layouts to some units, revise the location of an internal door, and provide fixed screens in lieu of sliding screens park elevations.
77-89 Alscot Road London Southwark SE1 3AW
Non-material amendment for planning application ref. 18/AP/2295 dated 15/10/2020 (for redevelopment of site to provide student housing in a building ranging from 3- to 7-storeys (plus basement) and ancillary bin store, cycle store, laundry and office/reception, car parking, substation, associated landscaping, and alterations to the vehicle access) to make the following changes: Introduction of an internal smoke ventilation shaft at 5th floor level rising through 6th floor to a rooftop automatic opening vent. Omission of window at 6th floor end of east corridor to be replaced by a rooflight.
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of Condition 6 - scale 1:5, 1:10 or 1:20 section detailed-drawings of the elements required by planning permission dated 29/11/2018 [LBS Ref 18/AP/2840] 'Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts',
Former Dock Managers Offices Surrey Quays Road London Southwark SE16 2XU
Details of Condition 3- external lighting [including design, power and position of luminaries] and security surveillance equipment of external areas.... as required by planning permission 20/AP/2467 dated 19/11/2020 for change of use of the Former Dock Manager Offices from existing use class D1 (business school) to a Project Hub (use class E); external and internal alterations; remedial works, including to the front facade of 1-14 Dock Offices; installation of plant; temporary landscaping; and external lighting. The internal and external alterations comprise the removal of internal partitions and creation of a double height space with new balustrade and exposed roof structure; restorative works to the existing staircase; the infill of the non-original skylight; replacement of non-original window glazing with slimline double-glazing; and the rationalisation of plant and installation of new plant. The remedial works comprise the repair and/or replacement of damaged brickwork; re-pointing of areas of damaged mortar; repairs to structural cracks; and the cleaning of the facade.
Unit 10 To 11 Dock Offices Surrey Quays Road London Southwark SE16 2XU
Additional works linked to Listed Building application 20/AP/2467 (Change of use of the Former Dock Manager Offices from existing use class D1 (business school) to a Project Hub (use class E); external and internal alterations; remedial works, including to the front facade of 1-14 Dock Offices; installation of plant; temporary landscaping; and external lighting. The internal and external alterations comprise the removal of internal partitions and creation of a double height space with new balustrade and exposed roof structure; restorative works to the existing staircase; the infill of the non-original skylight; replacement of non-original window glazing with slimline double-glazing; and the rationalisation of plant and installation of new plant. The remedial works comprise the repair and/or replacement of damaged brickwork; re-pointing of areas of damaged mortar; repairs to structural cracks; and the cleaning of the facade.) comprising the creation of two new openings at ground floor level
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of Condition 3 - External materials, as required by planning permission 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)
Former Dock Manager Offices Surrey Quays Road London Southwark SE16 2XU
Change of use of the Former Dock Manager Offices from existing use class D1 (business school) to a Project Hub (use class E); external and internal alterations; remedial works, including to the front facade of 1-14 Dock Offices; installation of plant; temporary landscaping; and external lighting. The internal and external alterations comprise the removal of internal partitions and creation of a double height space with new balustrade and exposed roof structure; restorative works to the existing staircase; the infill of the non-original skylight; replacement of non-original window glazing with slimline double-glazing; and the rationalisation of plant and installation of new plant. The remedial works comprise the repair and/or replacement of damaged brickwork; re-pointing of areas of damaged mortar; repairs to structural cracks; and the cleaning of the facade.
39B Consort Road London Southwark SE15 2AA
Non material amendment of planning permission 19/AP/1203 granted 23/01/2020 (Demolition of some of the existing buildings together with retention and restoration of the former workshop (the eastern most building) to be converted into commercial space. Construction of four part two, part three storey 3-bedroom family homes, and a four storey building to provide six new flats (2 x 1-bedroom, 3 x 2-bedroom and 1x 3-bedroom units). Construction of a part one, part two storey commercial building, to provide 349 sq. m of B1 (office) floor space together with associated landscaping, refuse stores and cycle parking.) Proposed Feature Brick Panel added; Previously approved Hit and miss brick screens omitted; Added proposed Meter Cupboards; Proposed Window Openings; Alterations to proposed window sizes and arangement and Proposed Flat roofs block of flats.
91 - 93 Peckham High Street London Southwark SE15 5RS
Minor material amendment to planning permission 16/AP/3075 [Approval date: 29.03.2019] 'Redevelopment comprising the removal of the Peckham Arch and redevelopment and part conversion of the southern part of the square (including 91-93 Peckham High Street) to provide a mixed use scheme comprised of two buildings of 4 and 6 storeys to provide 19 residential (Class C3) units, 255 sqm of gallery (Class D1) space, 201 sqm of co-work (Class B1) space, and 82 sqm of office (Class B1)/retail(Class A1) space with ancillary covered cycle storage and enclosed refuse storage' consisting of: - Changes to the design of Site/Block 1, including: - Reduction in the floor area of the consented gallery and associated facilities; - Reconfiguration of the residential core at ground floor level to incorporate a refuse store off Peckham High Street; - Addition of rooftop plant; - Alterations to the south, west and north elevations (fenestration, materials, parapet levels, rainwater goods etc.); - Transfer of sedum roof from roof of Level 02 to roof of Level 03; - Changes to the design of Site/Block 2, including: - Reduction in floor area of the co-working space; - Enlargement of building footprint; - Increase to the building's height; - Creation of separate bin store for co-working space; - Addition of rooftop plant; - Alterations to the west and north elevations (fenestration, materials, parapet levels, rainwater goods etc.); - Changes to landscaping and refuse strategy.