55 Casino Avenue London Southwark SE24 9PJ
Non-Material Amendment for planning application 22/AP/3669 dated 30.11.2022 for construction of single storey rear extension to replace existing conservatory with a small single storey extension alongside: Rebuilding of replacement front porch to match existing Replacement of existing upvc windows with double glazed timber casement windows to match original;. Amendments sought include: Roof level to central section reduced to 3M. Aluclad windows to be used in new extension in lieu of steel 'Crittal' type. High level glazing above double doors to living room omitted. Window to living room to extend out 300mm in lieu of 150mm originally show. Reduction in width of side elevation window in bedroom/study.
35 Tresco Road London Southwark SE15 3PY
Non material amendment of planning permission ref. no. 22/AP/2701: Demolition of an existing lean-to and conservatory to the rear and the construction of a single storey rear ground floor extension with a green roof the amendment is for the demolition of existing first floor outrigger, housing the first floor WC and re-building with a larger shower room.
First Floor Flat 25 Choumert Road London Southwark SE15 4AR
Variation of Condition 1 (Approved Plans) pursuant to planning permission 21/AP/2722 for 'Construction of a new rear dormer extension (to replace the existing)'. The amendment seeks the following: dormer is increased from 3250 to 3900 and to rebuild the conservatory in brickwork and windows and not to extend full depth to create a 900 balcony.
Flat 9 Rankin House 139-143 Bermondsey Street London Southwark SE1 3UW
Variation of Condition 2, of planning permission 17/AP/3746 (Construction of a roof extension at third floor level with a roof terrace; removal of the uPVC conservatory at second floor level replacement with new facade) Subsequent non-material amendment application - 19/AP/0256 Date of Decision: 24/01/2018 Condition Number(s): Condition 2. The development hereby permitted shall be begun before the end of three years from the date of this permission. Conditions(s) Removal: Our client has advised that due to the impact of COVID-19 and the uncertainty surrounding the economy, as well as the constraints we are experiencing on our construction sites, this has caused a delay to our planned start date for the above project which was due to commence in August this year. We anticipate a revised start date later in 2021. Please extend the permitted development time frame to allow the development to be implemented.