Capital House 42-46 Weston Street London Southwark
Discharge of Schedule 8 Para 1.5 Construction Environmental Management Plan logistics Plan and a Traffic Management & Logistics Plan as required by planning application 18/AP/0900 for Redevelopment of the site to include the demolition of Capital House 42-46 Weston Street SE1 with the erection of a 39-storey building (3 basement levels and ground with mezzanine and 38 storeys) of a maximum height of 137.9m (AOD) to provide up to 905 student accommodation units (Sui Generis use), flexible retail/café/office floorspace (Class A1/A3/B1), cycle parking, servicing, refuse and plant areas, public realm improvements and other associated works incidental to the development.
25 Lavington Street London Southwark SE1 0NA
Details of Condition 8 - Construction Method Statement required by planning permission dated 10/06/2021 [LBS Ref 20/AP/1009] for 'Redevelopment of the site including partial demolition of existing buildings and erection of two buildings including basement and above ground development of 10 and 15 storeys (in addition to plant) to provide office use (Class B1), retail use (Class A1), flexible retail and leisure (A1/A3, A3/A4, D2/A3/A4), landscaping, public realm, highway works, disabled car parking, cycle parking, plant and associated works'.
Brandon House 180 Borough High Street London SE1 1LB
Details of (Before the first occupation of each of the commercial elements of the development hereby permitted, a certified Post Construction Review (or other verification process agreed with the local planning authority) shall be submitted to and approved in writing by the Local Planning Authority confirming that a BREEAM rating of 'Excellent' has been achieved) required by Condition 21 of the planning permission ref: 15/AP/3097 dated 13/04/2016 for: Variation of Condition 1 (approved plans) of planning permission 14-AP-2695 which was a variation of 11-AP-2012 [for: 'Demolition of existing building and erection of a building (with basement) up to eight storeys in height (maximum 28.50m at corner) fronting Marshalsea Road and Borough High Street comprising office / retail floorspace (Class B1 / Class A use) and 96 residential units; erection of a four storey mews building to the rear (13.10m) comprising 4 residential units; provision of open space with ancillary plant, car parking and servicing, works of hard and soft landscaping and new pedestrian access to Borough High Street together with other associated and enabling works]' to secure: Reduction in basement size and minor revisions to the basement and ground floor layouts'
London South Bank University 103 Borough Road London Southwark SE1 0AA
Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter; - the construction of a five-storey 'meanwhile' pavilion building as part of Phase 1, which if/when Phase 2 is brought forward would be partly demolished and partly incorporated into the consented 'Learning Centre' component of the overall scheme; and - the provision of an external staircase, a temporary storage compound and hard surfacing in connection with the 'meanwhile' pavilion building, all of which would be removed if/when Phase 2 is brought forward.
25 Lavington Street London Southwark SE1 0NA
Details of Condition 7 - detailed scheme showing the complete scope and arrangement of the basement and foundation design, and all associated subterranean groundworks, including the construction methods - required by planning permission dated 10/06/2021 [LBS Ref 20/AP/1009] for 'Redevelopment of the site including partial demolition of existing buildings and erection of two buildings including basement and above ground development of 10 and 15 storeys (in addition to plant) to provide office use (Class B1), retail use (Class A1), flexible retail and leisure (A1/A3, A3/A4, D2/A3/A4), landscaping, public realm, highway works, disabled car parking, cycle parking, plant and associated works'.
16A Wyndham Road London Southwark SE5 0UH
Non-material amendment to the wording of Condition 11 (BREEAM) attached to 17/AP/0528 (Variations to Condition 1 (Approved Plans) of planning permission 14/AP/0175 for: Redevelopment of the site including demolition of existing buildings and erection of a residential-led mixed use scheme comprising five new buildings (Block 07: 9 storey, Block 08: 6 storey, Block 9: 4 storey, Block 10: 4 storey, Block 11: 5 storey) containing 82 flats, 222sqm new retail floorspace (class A1 use) and 616sqm of artists studios and associated gallery space (Class B1/D1 use), provision of 7 disabled parking spaces, cycle storage, refuse storage and associated landscaping. to allow the Post Construction Stage Certificate to be submitted within 6 months of the completion of the retail and commercial/community elements of the development
North Quay Aspen Way London E14
Proposal: PA/20/01421- Request for observations from London Borough of Tower Hamlets for Application for Outline planning permission (all matters reserved) for the redevelopment of the North Quay site for mixed use comprising: Demolition of existing buildings and structures; Erection of buildings and construction of basements; The following uses: - Business floorspace (B1) - Hotel/Serviced Apartments (C1) - Residential (C3) - Co-Living (C4/Sui Generis) - Student Housing (Sui Generis) - Retail (A1-A5) - Community and Leisure (D1 and D2) - Other Sui Generis Uses - Associated infrastructure, including a new deck over part of the existing dock; - Creation of streets, open spaces, hard and soft landscaping and public realm; - Creation of new vehicular accesses and associated works to Aspen Way, Upper Bank Street, Hertsmere Road and underneath Delta Junction; - Connections to the Aspen Way Footbridge and Crossrail Place (Canary Wharf Crossrail Station); - Car, motorcycle, bicycle parking spaces, servicing; - Utilities including energy centres and electricity substation(s); and - Other minor works incidental to the proposed development.