Open Land Rear Of 1-51 Peckham High Street Bounded By Sumner Avenue And Melon Road Open Land Adjacent To 59 Peckham High Street And Sumner House Located On Sumner Road London
Non-material amendment pursuant to 16/AP/4018 [Redevelopment of the site to provide four buildings to deliver 168 residential dwellings (Class C3) and flexible retail floor space (247m2) of flexible A1/A3/A4; The works include the conversion and extension of Sumner House (Block A) from office use (Class B1-c to provide 44 no flats and 4 no townhouses and partial demolition of boundary wall; the erection of a part 4, part 6 storey block to provide 39 no flats on Sumner Avenue (Block B); part 4(Block B); a part four, part 6 storey building to provide 72 no flats on Jocelyn Street (Block C); and a four storey block providing 9 flats on Melon Road (Block D), with 247m2 of flexible A1/A3/A4 use at ground floor level together with car parking, hard and soft landscaping, and other associated works incidental to the development] for the construction of a fire safety maintainance enclosure.
Landmark Court Land Bounded By Southwark Street Redcross Way And Cross Bones Graveyard London SE1
Details of Condition 7 'Final Construction Environmental Management Plan', for Block 02(B) only, attached to planning permission 19/AP/0830 [approval date: 05.01.2021] for: "Mixed-use development involving the demolition of 25-33 Southwark Street, the restoration of 15 Southwark Street for residential use and the erection of new buildings comprising: a part 6/8/9-storey office (Class B1) building incorporating a single-storey basement, flexible ground floor uses (Classes A1/A2/A3/A4 and D2) and workspace units (Class B1); a 3-storey workshop building (Class B1); a marketplace with up to 9 permanent stalls (Class A1); 36 residential units in the refurbished 15 Southwark Street building and a new 8-storey block; associated areas of new public realm; hard and soft landscaping; enhancements to Crossbones Burial Ground; means of access and enclosure, and; ancillary plant and equipment".
Wood Dene Site Bounded By Queens Road Meeting House Lane And Carlton Grove SE15
Details of Condition 19 part b 'Code for Sustainable Homes Final (Post Construction Certificates)' pursuant to planning permission ref. 14/AP/3029 (Variation of Condition 2 (approved plans) of planning permission 13/AP/0876 for: "Demolition of remaining structures and erection of three buildings between two and nine storeys in height to provide 333 residential units and 450sqm (GIA) of flexible retail (Classes A1-A3) / Office (Class B1) / Non-Residential Institution (Class D1) space together with the provision of access, car and cycle parking, plant, landscaping and an energy centre" to allow for amendments to the design of the facade and chimney of the energy centre in block C).
27 Crosby Row London Southwark SE1 3YD
Alterations to roof including construction of new dormer windows to front and rear, repair and refurbishment of existing fenestration, erection of rear extension at first and second floor levels, refurbishment and alterations including removal of historically unsympathetic fabric to reinstate courtyard at rear. Part of ground floor level in use as office space to continue to be used as office as well as studio workspace with remainder of property being retained as single residential unit.
27 Crosby Row London Southwark SE1 3YD
Alterations to roof including construction of new dormer windows to front and rear, repair and refurbishment of existing fenestration, erection of rear extension at first and second floor levels, refurbishment and alterations including removal of historically unsympathetic fabric to reinstate courtyard at rear. Part of ground floor level in use as office space to continue to be used as office as well as studio workspace with remainder of property being retained as single residential unit.
Brandon House 180 Borough High Street London SE1 1LB
Details of (Before the first occupation of each of the commercial elements of the development hereby permitted, a certified Post Construction Review (or other verification process agreed with the local planning authority) shall be submitted to and approved in writing by the Local Planning Authority confirming that a BREEAM rating of 'Excellent' has been achieved) required by Condition 21 of the planning permission ref: 15/AP/3097 dated 13/04/2016 for: Variation of Condition 1 (approved plans) of planning permission 14-AP-2695 which was a variation of 11-AP-2012 [for: 'Demolition of existing building and erection of a building (with basement) up to eight storeys in height (maximum 28.50m at corner) fronting Marshalsea Road and Borough High Street comprising office / retail floorspace (Class B1 / Class A use) and 96 residential units; erection of a four storey mews building to the rear (13.10m) comprising 4 residential units; provision of open space with ancillary plant, car parking and servicing, works of hard and soft landscaping and new pedestrian access to Borough High Street together with other associated and enabling works]' to secure: Reduction in basement size and minor revisions to the basement and ground floor layouts'
74-82 Rye Lane In Front Of Peckham Rye Station And 2-10 Blenheim Grove London SE15 4RY
Details of condition 4 (Construction Management Plan) of planning permission ref. 18/AP/2840 (Variation of condition 1 (approved plans) of planning permission 15/AP/4337 (Creation of a new public square between Peckham Rye Station and Rye Lane following demolition of the arcade buildings currently located between the north and south railway viaducts; refurbishment of the railway arches facing onto the new square and refurbishment and erection of a two storey extension to the building at 2-10 Blenheim Grove / 82 Rye Lane, to provide A1 (retail), A2 (financial and professional), A3 (restaurant / cafe), A5 (hot food takeaway), B1a (offices) and D1 (non-residential institution) uses, together with hard landscaping, public WC and other associated works.) comprising Increase in the overall height of extension by 500mm; Reduction in plan size of Blenheim Grove extension; Provision of boundary fence along railway parapet wall; Alterations to elevations including location of windows, louvres and inclusion of fixed access ladder and boundary fencing; Modifications to internal layouts.)