3-7 Bombay Street London Southwark
Variation of Condition 6 (S278 Highway Works) pursuant to 21/AP/0252 [Minor material amendment pursuant to 18/AP/3624 [Demolition of the existing two storey brick building on the site and construction of a contemporary mixed-use development to provide 9 residential apartments and ground floor commercial space] changes include: - Removal of fourth floor north east elevation window - Repositioning of first, second, third and fourth floor windows/doors casements to north east and south west elevations - Change of material of juliet balconies on first, second, third floors from metalwork to structural glass railings to north east elevation - Relocation of fourth floor terrace] for rewording of condition to replace reference of Penrose Street with Bombay Street.
Admiral Court Lomond Grove London SE5 7GY
Details of Condition 5 'Sample Panels' required by planning permission 19/AP/1276 granted by appeal APP/A5840/W/19/3242451 'The development proposed is erection of 3 storey roof extension to provide 5 residential units, upgrading of façade, minor reconfiguration of existing flats Nos. 3, 8, and 9, and replacement of existing windows.'
315-317 Camberwell New Road London SE5 0TF
Variation of Condition 7 to read The wheelchair accessible units hereby approved shall be constructed to meet the National Housing Standards 2015 Approved Document M4 (3) Category 3 Wheelchair User Dwellings, in respect of planning permission 15-AP-0613 for: Variation of Condition 1, approved plans, of planning permission 14-AP-3569 for: Variation of condition 1 (approved plans) of planning permission dated 12/09/2014 ref 14/AP/0257 to allow: the demolition of the existing snooker hall and the mixed use redevelopment of the site to involve the erection of a five-storey development with basement level to include a new snooker hall (D2 Use) 698 sqm, ground floor Class D2 use, 31 residential units (5 x 1 bed, 20 x 2 bed & 6 x 3 bed), hard and soft landscaping, associated private and communal open space, service / delivery area, 2 no. parking spaces for people with disabilities and all other associated infrastructural works: Variation allows the addition of 22sqm to the basement floor area. The provision of second bedrooms in flats 9, 18, 19 and 26 (with a consequential increase of 22sqm floor area). Minor changes to window arrangements.
227-255 Ilderton Road London Southwark SE15 1NS
Non material amendment of planning permission ref. no 19/AP/1773: Demolition of existing buildings and the erection of a part 2/3, 9 and 28 storey (up to 94.65m AOD) mixed-use development comprising of 3,581 sqm including 2,538 sqm of industrial floorspace (Use Classes B1c/B8) at ground and intermediate levels, 598 sqm of internal loading yard, 445 sqm ancillary plant and equipment; and 253 residential apartments (C3), 35.75% affordable by habitable room, and other associated infrastructure. This application represents a departure from strategic policy 10 'Jobs and Businesses' of the Core Strategy (2011) and Saved Policy 1.2 'Strategic and Local Preferred Industrial Locations' of the Southwark Plan (2007) by virtue of proposing to introduce residential accommodation in a preferred industrial location. Amendments include the following: -Amendment to window design to right hand of entrance (No.255) in south elevation; and -Introduction of two louvre panels in recessed brick façade within east elevation.
3 - 7 Bombay Street London Southwark SE16 3UX
Details of Condition 5 (Detailed drawings) pursuant to 21/AP/0252 [Minor material amendment pursuant to 18/AP/3624 [Demolition of the existing two storey brick building on the site and construction of a contemporary mixed-use development to provide 9 residential apartments and ground floor commercial space] changes include: - Removal of fourth floor north east elevation window - Repositioning of first, second, third and fourth floor windows/doors casements to north east and south west elevations - Change of material of juliet balconies on first, second, third floors from metalwork to structural glass railings to north east elevation - Relocation of fourth floor terrace].
3-5 Bombay Street London Southwark SE16 3UX
Discharge of Condition 3 [Site Investigation - Part C and D] pursuant to 21/AP/0252 (Minor material amendment pursuant to 18/AP/3624 [Demolition of the existing two storey brick building on the site and construction of a contemporary mixed-use development to provide 9 residential apartments and ground floor commercial space] changes include: - Removal of fourth floor north east elevation window - Repositioning of first, second, third and fourth floor windows/doors casements to north east and south west elevation - Change of material of juliet balconies on first, second, third floors from metalwork to structural glass railings to north east elevation - Relocation of fourth floor terrace).
3-7 Bombay Street London Southwark SE16 3UX
Removal of Condition 6 - S278 Agreement for full planning application 21/AP/0252 dated 01/04/2021 for minor material amendment pursuant to 18/AP/3624 Demolition of the existing two storey brick building on the site and construction of a contemporary mixed-use development to provide 9 residential apartments and ground floor commercial space] changes include: - Removal of fourth floor north east elevation window - Repositioning of first, second, third and fourth floor windows/doors casements to north east and south west elevations - Change of material of juliet balconies on first, second, third floors from metalwork to structural glass railings to north east elevation - Relocation of fourth floor terrace.
3-5 Bombay Street London SE16
Details of Condition 4 Facing materials samples as required by full planning permission 21/AP/0252 dated 31/03/2021 minor material amendment pursuant to 18/AP/3624 [Demolition of the existing two storey brick building on the site and construction of a contemporary mixed-use development to provide 9 residential apartments and ground floor commercial space] changes include: - Removal of fourth floor north east elevation window - Repositioning of first, second, third and fourth floor windows/doors casements to north east and south west elevations - Change of material of juliet balconies on first, second, third floors from metalwork to structural glass railings to north east elevation - Relocation of fourth floor terrace
3-5 Bombay Street London Southwark SE16 3UX
Minor material amendment pursuant to 18/AP/3624 [Demolition of the existing two storey brick building on the site and construction of a contemporary mixed-use development to provide 9 residential apartments and ground floor commercial space] changes include: - Removal of fourth floor north east elevation window - Repositioning of first, second, third and fourth floor windows/doors casements to north east and south west elevations - Change of material of juliet balconies on first, second, third floors from metalwork to structural glass railings to north east elevation - Relocation of fourth floor terrace
Plot H7 Heygate Street Within Land Bounded By Elephant Park To The North, Plot H2 To The West Heygate Street To The South London, Se17 And H11b To The East
Non-material amendments to reserved matters approval ref. 19/AP/1166 (Application for the approval of reserved matters (access, scale, appearance, layout and landscaping) for Plot H7 within Elephant Park (previously referred to as the Heygate Masterplan), submitted pursuant to Outline Planning Permission ref: 12/AP/1092. The proposal comprises the construction of a development ranging between 9 and 25 storeys in height (maximum building height 86.75 m AOD), comprising 424 residential units, 1,237sqm (GEA) of flexible retail (Classes A1 - A5) uses and 628 sqm (GEA) flexible retail, community and leisure (Classes A1-A5, D1-D2), car parking, cycle storage, servicing, plant areas, landscaping, public realm, and other associated works). The proposed amendments include: - Changes to balustrades of the tower from glazed to metal; - Alterations to the tower facades, including the introduction of horizontal spandrels on the infill panel between the windows, introduction of mid-trident spandrel expression, and rooftop parapet; - Amendments to the tower rooftop amenity, provide a larger internal enclosed space and a reduction in the external rooftop space; - Alterations to the consented land use quantum by the reconfiguration of the ground floor; - Alterations to the cycle parking provision; - Internal layout changes comprising changes to the ground floor, entry locations of the east and west 1-bedroom apartments within each floor of the tower; and tower level 1 void changes.