London South Bank University 103 Borough Road London Southwark SE1 0AA
Variation of section 106 Agreement dated 25.11.2019 pursuant to permission 17/AP/4233 to split all relevant obligations to reflect the two-phase phasing plan and other changes introduced by minor material amendment 20/AP/1333. The development description for 20/AP/1333 is: "Minor material amendment to planning permission 17/AP/4233 [Approval date: 26.11.2019] 'Redevelopment of the site by the erection of a part 7 storey/ part 4 storey building with basement and roof plant fronting onto Keyworth Street and Borough Road, a 5 storey building with roof plant fronting onto London Road linked by a central covered concourse; Part demolition with alterations and extensions to the grade II listed former Presbyterian Chapel; All to provide new academic teaching, library, student support and performance facilities (Use Class D1) and ancillary cafe/retail space. The creation of new public realm, hard and soft landscaping improvements within and around the site, streetscape improvements on Keyworth Street, the stopping-up of Rotary Street and Thomas Doyle Street, and other associated works' consisting of: - varying the wording of conditions to allow the development to be delivered in two separate phases, whereby Phase 1 would comprise early works to develop the Chapel and the immediately adjoining 'Performing Arts Centre' component of the overall scheme, and Phase 2 would comprise the remainder of the St George's Quarter".
87 Newington Causeway London Southwark SE1 6BD
Variation of Condition 13, relating to the provision of Accessible units, of planning permission 16/AP/3144 (Redevelopment of the site for a mixed use development comprising a basement/mezzanine basement, ground plus twenty three floors to accommodate a 140 room hotel (levels 1 11), 48 residential units (levels 12 24), a retail unit (at ground floor), associated cycle parking, servicing and refuse and recycling, landscaping and private and communal residential amenity space (including at roof top level), external refurbishment to the front of the railway arches, and a new pedestrian route through the site linking Newington Causeway with Tiverton Street) to regularise the wording of the condition in line with non-material amendment 18/AP/1817.